Omron Quattro 650H Скачать руководство пользователя страница 3

Chapter 1: Quattro ePLC Robot Quick Setup

1.1 Introduction

Process Overview

This Quick Setup Guide presents the steps that are specific to a Quattro ePLC installation. The
major steps are:

l

Preparation

, including workcell layout and safety

l

Hardware Installation

, including mounting the robot and system cable connections

l

System Start-Up

, including system configuration and tuning on the robot

It is assumed that the following have been completed. Refer to the Quattro Robot User's Guide
for information on these steps:

l

Design and construction of a robot frame

l

Installation of the robot cable box and cable tray on robot (Quattro HS)

l

Attachment of the outer arms and platform on the robot

NOTE

: This guide does not apply to robot systems that include a SmartController

motion controller. Refer to the Quattro Robot User's Guide for those systems.

During the installation and start-up process, refer to the Quattro Robot User's Guide, for more
information on your robot system. Also refer to your PLC user’s guide.

Resources on the Support Disk

l

This guide (along with three other ePLC robot quick setup guides)

l

The

Quattro s650/800 User's Guide

Resources on Omron Web Sites

On the Omron Industrial Automation web site:

ia.omron.com

l

The

ePLC Connect 3 Software User's Guide

l

EtherNet/IP Connection Guide (P649-E1-01)

This covers ePLC for the Omron NJ controller with Omron Adept Robots.

l

EtherNet/IP Connection Guide (P650-E1-01)

This covers ePLCIO for the Omron NJ controller with Omron Adept robots

Quattro ePLC650/800 Quick Setup Guide, 13588-000 Rev D

Page 3 of 16

Содержание Quattro 650H

Страница 1: ...I598 E 01 Quick Setup Guide Quattro 650H 650HS 800H 800HS ePLC...

Страница 2: ...iewed and revised Omron Adept Technologies Inc assumes no responsibility for any errors or omissions in this document Critical evaluation of this manual by the user is welcomed Your comments assist us...

Страница 3: ...the robot NOTE This guide does not apply to robot systems that include a SmartController motion controller Refer to the Quattro Robot User s Guide for those systems During the installation and start u...

Страница 4: ...Supplied Safety Equipment in the System Installation chapter of the robot user s guide which provides details on connecting a user designed E Stop system to the XUSR connector on the robot 1 3 Workcel...

Страница 5: ...nted such that the Status Display panel faces away from the con veyor if your system has a conveyor This will give you the best view of the Status Display panel and provide the best cross belt movemen...

Страница 6: ...ide the frame you will have to twist the robot so that its mounting pads clear the frame mounting pads and you can raise it above the frame 6 Slowly lower the robot while aligning the M16 holes in the...

Страница 7: ...es Install Mounting Hardware NOTE When mounting the robot note the following 1 Place split lock then flat washers on the bolts Bolts are M16 x 2 0 if threaded into the robot base mounting tabs Bolts a...

Страница 8: ...356 10500 90356 10358 standard F Front Panel Jumper Plug 10053 000 13323 000 standard eAIB G XMCP Jumper Plug 04737 000 13323 000 standard eAIB H T20 Bypass Plug 10048 000 10055 000 standard T20 J T20...

Страница 9: ...nect user supplied ground to robot See robot user s guide for location n a 5a Connect user supplied ground to SmartVision MX if used See SmartVision MX user s guide for location n a 6 Connect 200 240...

Страница 10: ...4a A B G H J 4a 4 4 1 5 6 7 9 8 L M Q P E K D N 3 85 264 VAC Universal Input DC IN 24V GND AC 200 240V 1 XBELTIO XIO Servo ENET ENET XSYSTEM Ethernet from PLC to eAIB FP Jumper Plug F Either Front Pa...

Страница 11: ...software Setting the Robot IP Address Configure the IP address of the Quattro ePLC robot using ACE software 1 Connect the PC and the robot either through a shared network or with an Ethernet cable be...

Страница 12: ...ect to on the robot Enabling High Power The details of enabling high power to the robot are covered in the EtherNet IP Connection Guide P649 E1 01 Once high power is enabled the Robot Status Panel dis...

Страница 13: ...pter of the Quattro User s Guide l Robot Status LED Indicator l Status panel fault codes l Brake Release button located above or in diagnostic panel l Connecting digital I O on the XIO connector at th...

Страница 14: ......

Страница 15: ......

Страница 16: ...ADEPT TECHNOLOGIES INC 4550 Norris Canyon Road Suite 150 San Ramon CA 94583 U S A Tel 1 925 245 3400 Fax 1 925 960 0590 Regional Headquarters OMRON EUROPE B V Wegalaan 67 69 2132 JD Hoofddorp The Neth...

Отзывы: