1 Preparation
1-3 Installation orientation
BUM5002R/BUM3002R
16
1-3 Installation orientation
When installing the unit, install it in the correct orientation as shown in the following figures.
⚫
Correct positions
<When installed horizontally>
UPS main unit
Expansion battery unit
• Do not install the unit upside down.
• Do not stack the units. Install them in the rack.
BUM300
2R
BATTER
Y UNIT