iii
Procedure from installation to operation
Start
Installation/connection
Preparation for operation
Maintenance/
inspection
Yes
No
No
Yes
Read “Safety precautions”
Page v
Remove the product from the
package and check the contents
Page 1
Perform installation and
connection Page 5
Check the operation and
displays Pages 19
Charge the battery
Page 21
Measure the backup time
Page 32
Read “Using the UPS
monitoring software and
contact signal” Page 40
Operate Page 22
Deteriorated
battery?
Perform maintenance
and inspection Page 34
Replace the battery
Are you
using UPS monitoring
software or contact
signal?
Charge the battery again
Page 21
* Preparation for operation is
complete.
Содержание BU1002RW
Страница 64: ...10 52 Notes of Chinese 10 UPS UPS 1 FA OA Windows UPS...
Страница 65: ...10 Notes of Chinese 53 2 FA OA 2...
Страница 66: ...BU1002RW 10 54 AC 50 60Hz AC AC AC AC...
Страница 67: ...10 Notes of Chinese 55 5cm 10cm UPS UPS AC AC AC200V 240V AC200 240V...
Страница 68: ...BU1002RW 10 56 AC AC AC AC AC ON OFF AC INPUT PROTECTION 25 5 2 5 35 3 5mA...
Страница 69: ...10 Notes of Chinese 57 AC UPS AC UPS...
Страница 70: ...BU1002RW 10 58 AC AC 50 60Hz 25 25 6 40 2 AC AC...
Страница 71: ...10 Notes of Chinese 59 DC250V UPS 200V http www fa omron com cn Pb AC AC 50 60Hz...
Страница 73: ...10 Notes of Chinese 61 3 UPS Instruction Manual 1 UPS UPS UPS UPS 2 UPS AC UPS AC UPS 3 UPS UPS ON UPS...