16.
Initial Setup
25
www.sinetech.co.za
16.
Initial Setup
Before i
nverter operation, set up “Operation Mode” via software. Strictly follow below
steps to set up. For more details, please check software manual.
Step 1:
After turning on the inverter and installing the software, please click “Open
Monitor” to enter main sc
reen of this software.
Step 2:
Log in to software first by entering default password “administrator”.
Step 3:
Select Device Control>>MyPower Management. This is to set up inverter
operating mode and personalized interface. Refer to diagram below.
Mode
There are three operation modes: Grid-tie with backup, Grid-Tie and Off-Grid.
•
Grid-tie with backup
: PV power can feed back to grid, provide power to the
load and charge battery. There are four options available in this mode: Grid-tie
with backup I, II, III and IV. In this mode, users can configure
PV power supply
priority, charging source priority and load supply source priority.
However, when
Grid-tie with backup IV option is selected in PV energy supply priority, the inverter
is only operated between two working logics based on defined peak time and off-
peak time of electricity. Only peak time and off-peak time of electricity are able
to set up for optimized electricity usage.
•
Grid-Tie
: PV power only can feed-in back to grid.
•
Off-Grid
: PV power only provides power to the load and charges battery. No
feed-in back to grid is allowed.
•
Содержание OHY1P4805
Страница 1: ...1 Introduction USER MANUAL V3 0 5kW Hybrid Inverter OHY1P4805...
Страница 22: ...12 Dry Contact Signal 20 www sinetech co za You can set the related parameters in software Refer to below chart...
Страница 44: ...17 Operation 42 www sinetech co za Date and time Procedure Today s or total energy generated Procedure...