1.  Unpack the monitor and antenna.  The integrated cable includes 

wires to power the monitor as well as wires for alarm inputs, relay 
outputs and analog inputs. Inspect all components to verify there 
is no shipping damage. 

2.  Place the antenna vertically on the outside cabinet of the 

generator in an appropriate location that will not interfere with any 
of the openings, and route the antenna cable into the area of the 
generator control. It may be necessary to drill a hole in the 
exterior housing and use the included plate to mount the antenna. 
The antenna used for transmitting must be installed to provide a 
separation distance of at least 20 cm from all persons and must 
not transmit simultaneously with any other antenna transmitters.  
BE SURE to provide a drip loop lower than the monitor to keep 
water from running down the antenna cable into the monitor 
connection.   

3.  Attach the monitor via its magnetic feet in an appropriate 

location. Horizontal surfaces are best, but the unit may be 
mounted vertically or even upside down if necessary

Note: If 

mounted vertically, install the monitor with the cables down to 
prevent water from entering the enclosure.

  

4.  Instructions for wiring the monitor can be found in the table on 

the following page. 

5.  Attach the antenna cable to the front of the monitor, and tighten 

thumb tight. 

6.  Allow 15 minutes for the monitor to log into the network and 

then call OmniMetrix at 770-209-0012 to confirm installation.  
Access to machine data is through the OmniView

®

 web 

interface at 

www.omnimetrix.net

. Contact OmniMetrix for login 

instructions and web training. 