Omni International Bead Ruptor 4 Скачать руководство пользователя страница 12

Error Code

Definition

Cause

Possible Solution

Error 1

Display screen 

shows

incomplete or

unusual characters

CPU needs to be 

reset

Turn off the unit. Wait 30 seconds.
Turn the unit back on.

Error 2

No display on the

screen

No Power

Check main voltage.
Check that the voltage of the unit (100V-240V) 
matches what is being delivered by the main 
power supply.
Make sure the unit is plugged in properly.
Check and replace fuses if blown.

Faulty display screen

Turn off the unit.
Contact manufacturer for assistance.

Error 3

Unit powers on but

motor does not turn

Faulty motor

Contact manufacturer for assistance.

Error 4

Close Door

Lid is not seated 

properly.

Check Lid latch for obstruction
Press lid and ensure the handle is closed

Detection system

is faulty.

Troubleshooting

Error Codes 

WARNING: Any service must be performed by a qualified service technician. This can be either 

an OMNI Technician or an end user resource. 

All parts need to be sourced from the OMNI International service department

ADVERTISEMENT : Tout entretien doit être effectué par un technicien d’entretien qualifié. Il peut 

s’agir d’un technicien OMNI ou d’une ressource utilisateur final.

Toutes les pièces doivent provenir du service après-vente d’OMNI International.

Содержание Bead Ruptor 4

Страница 1: ...User Manual Bead RuptorTM 4 Bead Mill Homogenizer...

Страница 2: ......

Страница 3: ...IGENCE AND ALL WARRANTIES OF MERCHANTABILITY OR OTHERWISE EXPRESSED OR IMPLIED IN FACT OR BY LAW AND STATE OUR ENTIRE AND EXCLUSIVE LIABILITY AND BUYERS EXCLUSIVEREMEDYFORANYCLAIMOFDAMAGESINCONNECTION...

Страница 4: ...surfaces chauff es NE PAS modifier la fiche ou le cordon fourni Si la fiche ne s adapte pas la prise faites prise appropri e install e par un lectricien qualifi NE PAS utiliser le produit avec la mis...

Страница 5: ...box Lift unit up and off of the box bottom DO NOT LIFT THE UNIT BY HOLDING THE LID Remove Tool Kit and Power Cord Place the unit on a stable surface Remove the 2 screws from the bottom of the unit Co...

Страница 6: ...eventative Maintenance Normal use 12 month interval Heavy use may require a 6 month interval Electric Supply 4C to 40C 39F to 104F Humidity 5 to 95 RH Internal use only Electric Supply 19 042E 115V 50...

Страница 7: ...tative Maintenance Replace Tube holders once a year at a minimum Table of Symbols Symbol Description Symbol Description Caution Refer to the User documentation ISO 7000 0434B On power IEC 60417 5007 H...

Страница 8: ...1 Overview 1 4 2 5 3 1 Lid 2 Keypad 3 Lid Latch 4 ON Off Switch 5 Power Cord Port 6 Speed Control 7 Timer Control 8 Run Button 9 Stop Button Speed 5 Time 30 6 8 7 9 The Bead RuptorTM 4 Bead Mill Homo...

Страница 9: ...buttons from 1 sec to 5 min 4 Start Press Run button 5 Pause Stop Press Stop Button to Pause Press Stop again to reset timer and cancel run 1 Digital Display 2 Timer 3 Speed Control 4 Timer Control 5...

Страница 10: ...Loading Sample Tubes 1 5 mL 2 mL Tubes 7 mL Tube Carriage 7 mL Tubes OMNI Bead tubes should be used exclusively with OMNI Bead RuptorTM Homogenizers...

Страница 11: ...the new neck gasket onto the pivot shaft and housing 3 Secure the new neck gasket using the restriction tie with the clamp positioned toward the bottom of the instrument Tighten central screw 4 Use th...

Страница 12: ...Unit powers on but motor does not turn Faulty motor Contact manufacturer for assistance Error 4 Close Door Lid is not seated properly Check Lid latch for obstruction Press lid and ensure the handle is...

Страница 13: ...will slide back Lift the tube carriage to align the motor mount holes to the holes in the base plate Insert screws with allen key until you feel them engage It may take some finesse to get them align...

Страница 14: ...Notes...

Страница 15: ...Notes...

Страница 16: ...PN 03 225 01 Rev N 935 Cobb Place Blvd Kennesaw GA 30144 800 776 4431 770 421 0058 www omni inc com...

Отзывы: