manualshive.com logo in svg
background image

Relay 1

Relay 2

Energize

De-Energize

Energize

De-Energize

Backup

Primary

Stop

Relay 1

Relay 2

Energize

De-Energize

Energize

De-Energize

Backup

Primary

Stop

Duplexing

Control

Operation

Alternating

Control

Operation

OPERATION

Step Sixteen

Relay X

Energize

De-Energize

Start

Stop

Automatic

Empty

Operation

Automatic

Fill

Operation

Out of

Bounds

Operation

Relay X

Energize

De-Energize

Stop

Start

Relay X

Energize

De-Energize

High

Low

Functional Chart for Relay On/Off Operations

All manuals and user guides at all-guides.com

Содержание LVCN700 Series

Страница 1: ...nder warranty and 3 Repair instructions and or specific problems relative to the product FOR NON WARRANTY REPAIRS consult OMEGA for current repair charges Have the following information available BEFO...

Страница 2: ...C ABS FR Trans material PVDF Kynar Process mount LVCN704 709 1 NPT 1 G LVCN716 726 2 NPT 2 G Mount gasket Viton Conduit entrance Dual 1 2 NPT Classification General purpose CE compliance EN 61326 EMC...

Страница 3: ...lease refer to the part number located on the switch label to verify the exact model con figuration which you have purchased User s Responsibility for Safety Omega manufactures a broad range of level...

Страница 4: ...nergize until the level reaches the de energize set point Alternation will automati cally fill or empty the tank with two pumps switching after each cycle PREPARATION A Supply Voltage The power supply...

Страница 5: ...pro gram the channel with new set points or leave it inactive PROGRAMMING Set Point Calibration Box Insert Table Target Wall Tape Distance Set Point Cal Run High Low Select RELAY 1 RELAY 2 RELAY 3 L1...

Страница 6: ...ramming High Set Point Distance Low Set Point Distance Energize Energize De energize Out of Bounds D Programming Automatic Fill After having powered the switch with the appropriate supply voltage ente...

Страница 7: ...ogramming Duplexing Pump Control After having powered the switch with the appropriate supply voltage entered the CAL mode selected relay channel 1 and erased any previously input set points follow the...

Страница 8: ...m start up Gasket Flange on Riser Height Inner Diameter Riser Bracket Stand Pipe Dead Band Ventilation Hole Operational Range Highest Liquid Level Lowest Liquid Level 2 3 Minimum Diameter Step Twelve...

Страница 9: ...or turbulence that may reduce or eliminate the acoustic signal strength Read the Maximum Applied Range Step 4 E and consider rein stalling the switch in a Stand Pipe Step 11 A 4 to dampen turbulence...

Страница 10: ...exing Control Operation Alternating Control Operation OPERATION Step Sixteen Relay X Energize De Energize Start Stop Automatic Empty Operation Automatic Fill Operation Out of Bounds Operation Relay X...

Отзывы: