AOK 20SS Ex - Installation and operating manual
9
6.
Installation
Before installing the product, check that thy system is
not under pressure. Wear necessary personal protective
equipment and folow the safety rules when working
with pressure equipment.
The product should be unpacked at the installation location and inspected for
damage prior to installation. Damaged product must not be installed.
It is necessary to ensure that covers have been removed from all the connections
beffor installation.
Before connecting the product, blow compressed air through the piping in order to
thoroughly clean out any impurities within it.
Install the drain at a level below the receiver, if not the receiver will fill up with
condensate.
Earthing of the product must be done with wire of cross-section ≥1.5 mm
2
. Make
earthing on position 3 and 4.
It is recommended to install a ball valve between the product and the system. This is
done to ensure easy maintenance work on the product without the needed to empty
the entire system.
It is recommended to add strainer, and then the connection nipple (position 19) to
allow the flow of air upward.
After initial run, open the product and clean all components.
It is strongly recommended that waste condensate from discharge port is connected
to water treatment application, such as water oil separator to protect the
environment from pollution and to comply with environmental laws.