TACm - Installation and operating manual 

 

 7 

201

9

1219

 

Commissioning 

 

PRESSURIZATION 

 Rapid  pressurization  can  cause  damage  to  the  activated  carbon  tower!  Activated  carbon 
tower  should  be  pressurised  extremely  slowly  through  an  appropriate  valve  at  the  inlet. 
During the pressurisation process the outlet valve should remain closed and the adsorption 
dryer should not be operational.  

Follow the pressurisation procedure:  

 

Make certain that the outlet valve is closed. 

 

Open the inlet valve slightly until you hear first flow noise. 

 

Wait until you no longer hear flow noise. 

 

Fully  open  the  inlet  valve  and  wait  until  the  manometer  indicates  that  tower  is 
pressurised to the operating pressure. 

 

OPENING OUTLET VALVE 

Opening  of  the  outlet  valve  should  be  done  extremely  slowly  especially  when  the  system 
downstream of the valve is not pressurized.  

Follow the procedure:  

 

Open the outlet valve slightly until you hear first flow noise. 

 

Wait until you no longer hear flow noise. 

 

Fully open the outlet valve. 

Maintenance 

 

 

Replace activated carbon cartridge(s) every 6 months or sooner if required 
(cartridges can be replaced trough upper cap 

 unscrew 4 acorn nuts and remove 

cap).  

 

Damaged components are to be replaced by new ones. If a marked degree of 
damage is found, the entire tower is to be replaced.  

 

Tower has been designed for a life of 10 years in normal operating environment. 
After 10 years periodical checks of tower integrity are strongly recommended for 
safe operation. 

 

Carry out a check for leaks once the maintenance work has been finished. 

Before maintenance depressurize the system! 

Содержание TACm Series

Страница 1: ...tions carefully before installing the product Trouble free and safe operating of the product can only be guaranteed if recommendations and conditions stated in this manual are respected 20191219 Insta...

Страница 2: ...2 20191219 Components Part 1 Body filled with AC 2 Rod with thread 3 Cap nut 4 Top cover 5 Bottom cover 6 Legs 7 Screw 2 3 4 5 1 6 7...

Страница 3: ...Cm 70 G 1 2 75 41 1 1277 212 160 5 8 12 2 20 3 TACm 105 G 1 2 105 61 8 1677 212 160 8 16 6 26 Refers to 1bar a and 20 C at 7 barg operating pressure and inlet temperature 20 C TECHNICAL SPECIFICATION...

Страница 4: ...instructions shall apply for operating the tower The tower has been constructed in accordance with the generally recognized rules of engineering It complies with the requirements of directive 2014 68...

Страница 5: ...es All installation and maintenance work on the tower may only be carried out by trained and experienced specialists It is forbidden to carry out any kind of work on the tower and piping including wel...

Страница 6: ...uine parts is not covered by Warranty or Product Liability Installation Place the tower on suitable straight surface or pedestal If needed or requested fix it with screws through holes in tower s legs...

Страница 7: ...NING OUTLET VALVE Opening of the outlet valve should be done extremely slowly especially when the system downstream of the valve is not pressurized Follow the procedure Open the outlet valve slightly...

Страница 8: ...nce The unit was not operated properly and appropriately The unit was operated when it was clearly defective Non original spare parts or replacement parts were used The unit was not operated within th...

Страница 9: ...allation and operating manual 9 20191219 OMEGA AIR d o o Ljubljana Cesta Dolomitskega odreda 10 SI 1000 Ljubljana Slovenia Tel 386 0 1 200 68 00 Fax 386 0 1 200 68 50 E mail info omega air si www omeg...