
17
Installation
Operation
DAILY OPERATION
1.
Check the chemical containers to be sufficient full.
2.
Replace the overflow pipe and the surface screeners into correct position.
3. Turn on the dishwasher by putting the switch No 1 into on position.
4. Wait 20 minutes in order both the tank and booster to be fully heated.
Attention: the full heating process is finished when both warming lights are off.
Содержание 45219
Страница 6: ...6 Technical Specifications ...
Страница 7: ...7 Technical Specifications PRODUCT SERIAL NUMBER ...
Страница 24: ...24 Model CD GR 0500 45219 Parts Breakdown ...
Страница 25: ...25 Model CD GR 0500 45219 Parts Breakdown ...
Страница 26: ...26 Model CD GR 0500 45219 Parts Breakdown ...
Страница 27: ...27 Model CD GR 0500 45219 Parts Breakdown ...
Страница 28: ...28 Model CD GR 0500 45219 Parts Breakdown ...
Страница 29: ...29 Model CD GR 0500 45219 Parts Breakdown ...
Страница 30: ...30 Model CD GR 0500 45219 Parts Breakdown ...
Страница 31: ...31 Model CD GR 0500 45219 Parts Breakdown ...
Страница 32: ...32 Model CD GR 0500 45219 Parts Breakdown ...
Страница 33: ...33 Model CD GR 0500 45219 Parts Breakdown ...
Страница 34: ...34 Model CD GR 0500 45219 Parts Breakdown ...
Страница 35: ...35 Model CD GR 0500 45219 Parts Breakdown ...
Страница 36: ...36 Model CD GR 0500 45219 Parts Breakdown ...
Страница 37: ...37 Model CD GR 0500 45219 Parts Breakdown ...
Страница 38: ...38 Model CD GR 0500 45219 Parts Breakdown ...
Страница 39: ...39 Model CD GR 0500 45219 Parts Breakdown ...