OMC KA30 Series Скачать руководство пользователя страница 5

Installa on, Opera on and Maintenance Manual KA30‐en  Rev.04/2018 

Page 5   

OMC s.r.l.  Via G. Galilei, 18 - 20060 - Cassina de Pecchi (MI) - ITALY - www.omcsrl.com - Tel.: (+39) 02.95.28.468                                       

Our products a

re manufactur

e

d und

er ISO-9001 Qua

lit

As

suranc

S

yste

m

, approve

d b

y CSQ certifie

d

 under n

o.91

90

.OMC2 - F

IRST

 IS

SUE 1994/08/04

 

ENGLISH

 

2.0 INSTALLATION 

All works must be performed and supervised by skilled, trained and competent personnel. 

The fusion of the OMC valves’ body highlights the flow direction, the maximum operating pressure and the 
material. 

Before installing the valve, make sure that the pipe which channels the process fluid is clean, by performing, if 
required, an energetic blowing with steam or compressed air. 

The installation of a filter (pos. A Pic. 1) upstream the valve will prevent the entrance of any dirt in the plug. 

To perform periodical maintenance operations of the valves installed on continuous-operation systems, it is 
recommended to install two shut-off valves, located upstream (pos. B Pic. 1) and downstream (pos. C Pic. 1) of 
the control valve, and a by-pass one (pos. D Pic. 1). Use the by-pass valve (pos. D Pic. 1) to manually regulate 
the process when the control valve is temporarily disconnected. The two shut-off valves must have the same 
internal diameter of the control valve. During the installation of the valve, make sure that the flow in the pipe goes 
in the same direction as indicated by the arrow on the valve body. 

 

Pic. 1 Installation diagram

 

The assembling position of the valve does not limit its operation, but it is recommended to assemble the valve 
with the actuator pointed upward (pos. E Pic.1) as other positions might allow the accumulation of any impurities 
which are contained in the fluid thus damaging the valve itself.

 

2.01 ASSEMBLY OF THE VALVE ON THE PIPE 

To  ensure  a  uniform  load  and  a  uniform  alignment,  the  flange  bolts  must  be  gradually  tighted  in  criss-cross 
sequence, as indicated in Pic.2 

Prevent  any  excessive  tightening.  Use  the  recommended  tightening  torques.  Prevent  any  pipe 
misalignment. Choose the flange gaskets according to the operating conditions. 

ATTENTION!!!  For  valves  with  braze-on  connections,  the  welding  operation  must  be  performed 

only  by  qualified  personnel  and,  in  order  to  prevent  any  damages  to  the  valves,  keep  the  valve 

body cold during the above-mentioned operation.  

Pic. 2 Tightening sequence

 

Содержание KA30 Series

Страница 1: ...lei 18 20060 Cassina de Pecchi MI ITALY www omcsrl com Tel 39 02 95 28 468 Our products are manufactured under ISO 9001 Quality Assurance System approved by CSQ certified under no 9190 OMC2 FIRST ISSU...

Страница 2: ...07 SYSTEM 1 08 PRESSURIZED SYSTEMS 1 09 TOOLS AND CONSUMABLE PARTS 1 10 PROTECTION CLOTHES 1 11 QUALIFICATION OF OPERATORS IN CHARGE OF THE WORKS 1 12 HANDLING 1 13 FREEZING 1 14 OTHER RISKS 1 15 DIS...

Страница 3: ...ng means if required 1 03 LIGHTING Ensure a lighting which is suitable to the required type of work 1 04 HAZARDOUS FLUIDS IN THE PIPE Take account of the content of the pipe or anything it may have pr...

Страница 4: ...performed and supervised by some skilled trained and competent personnel 1 12 HANDLING Use suitable lifting means for the handling of the products by assessing all the risks concerning the lifting the...

Страница 5: ...Use the by pass valve pos D Pic 1 to manually regulate the process when the control valve is temporarily disconnected The two shut off valves must have the same internal diameter of the control valve...

Страница 6: ...1 PNEUMATIC ACTUATOR CONNECTION The pneumatic actuator is provided with two 1 4 NPT connections one of which is closed by a filter Connect the control air pipe to the connection which has remained fre...

Страница 7: ...for any other need always refer to the above mentioned number During the operation the valve is pressurized Before performing any maintenance operation or action on the flanges and closing caps make...

Страница 8: ...age 5 Replace the sealing gasket of the balancing piston 8 by unscrewing the guide 6 If required unscrew and replace the seat 2 by using the specifc wrenches Insert in the bonnet 9 the new plug by pay...

Страница 9: ...screw 1 Remove the upper packing gland 2 Remove the spring 3 Remove the lower packing gland 4 Replace the O ring 5 if provided Carefully clean the housing chamber and grease it with silicone oil Inse...

Страница 10: ...pproved by CSQ certified under no 9190 OMC2 FIRST ISSUE 1994 08 04 OMC s r l Via G Galilei 18 20060 Cassina de Pecchi MI ITALY www omcsrl com Tel 39 02 95 28 468 ENGLISH 5 0 TIGHTENING TORQUES VALVE D...

Страница 11: ...68 Our products are manufactured under ISO 9001 Quality Assurance System approved by CSQ certified under no 9190 OMC2 FIRST ISSUE 1994 08 04 ENGLISH 8 9 Pic 18 Valves 3 4 1 5 7 Pic 17 Valves 1 2 2 6 V...

Страница 12: ...maged parts Periodically verify any phenomena of internal and or external corrosion and or erosion as they may significantly damage the pressurized parts by locally reducing the thickness and as a con...

Отзывы: