
Step 3
: your pantograph support is now balanced and you
need to fix it so that it is perfectly horizontal. To achieve
this, get a level gauge and with the use of suitable
materials for the type of wall on which the support is to be
fixed, secure the support using the 8 fixing holes
D
( 4
above and 4 below).
Now that you have fixed your bottom left monitor support to the wall you need to take the measurements for the other
monitors: we'll start with the first row.
Step 4:
with a laser level gauge trace a perfectly horizontal
line using the upper part of the already fixed pantograph
support as reference
Step 5:
with the use of the lateral DIME ( included in the
Omb customized Kit
, ) identify the exact position of the
following support next to the first. Be careful to align all
the brackets to the alignment line that you previously
traced.
Step 5 bis:
In case you do not want use the lateral DIME
(included in the
Omb customized Kit
) you can install
however your video wall. First, you have to measure the
two main dimensions of the monitor (width “A”; height
“B”). Then, you have to identify the centre point of the
monitor.
Step 6:
with the use of the superior DIME (included in the
Omb customized Kit)
, position the second row. Always
start from the left and proceed in the same way as you did
with the first row.