INSTALLATION
Tools:
Model Number:
P-230XB, P-240XB
Warnings and Notes:
Check with local plumbing code requirements before installation.
This product should be installed by a local listed plumber.
Do not use plumbers putty on threads.
Installation Steps:
Single Handle Pressure Balance Tub and Shower Valve Set
1143mm [45"] /
1218mm [48"]
Min. 203.2mm [8"]
(1) For CXC installation :- Remove all
the parts before soldering.
(2) Refer to installation drawing for
dimension. Install inlets and outlets
connection to the valve. Avoid cross flow
connections. Do not install shut off valve
to any of the outlets. Cap the tub port or
shower port for shower only or tub only
installations. For threaded connections
do not overtighten.
(3) Important: Do not use PEX or
CPVC between the valve and tub
spout.
- Distance between valve body and
showerhead outlet should be minimum
45” to maximum 48”.
- Distance between valve body and
diverter tub spout should be minimum 8”
to maximum 18”.
(4) For CXC installation: Once the inlets
and outlets are installed. Carefully
replace all the parts. Do not tighten more
than 5lbs/inch2 while replacing inlet stop
assemblies. Overtightening may cause
damage to the inlet stop assembly.
(5) Rotate the ceramic cartridge 180
degree. Ensure B to B “UP” marking on
cartridge is on top position. Check for
any Leak before finishing wall.
Ø4" MI
N
Ø5" MA
X
47.5mm
[1 7/8"]
3/16"(typ) (5mm)
Ø157.5mm [Ø6 1/4"
]
63.5mm
[2 1/2"]
2" CXC (51mm)
1 7/8" IPS (48mm)
MAX WALL
1/2" MIN CXC (13mm)
5/8" MIN IPS (16mm)
THICK WALL
THIN WALL
Installation Drawing P-230XB
2" CXC (51mm)
1 7/8" IPS (48mm)
MAX WALL
Ø157.5mm [Ø6 1/4"
]
54mm
[2 1/8"]
1/2" MIN CXC (13mm)
5/8" MIN IPS (16mm)
Ø4" MI
N
Ø5" MAX
3/16"(typ) (5mm)
38mm
[1 1/2"]
THICK WALL
THIN WALL
Installation Drawing P-240XB
Adjustable
Wrench
Hacksaw&
Pipe Cutter
Propane
Torch
Lead-Free
Solder
PEX Crimp
Tool
Teflon Tape
OLYMPIA FAUCETS, INC.
3325 S. Garfield Ave.
Commerce, CA 90040
(888) 772-7701
www.olympiafaucets.com