background image

1

2

1

Pictogram Installation

3

1.  Operations  for  installation,  maintainance  or 

testing  must  be  done  by  authorized  personnel 
only.

ΑΤΤΕΝΤΙΟΝ!!!

When  the  luminaire  is  used  without  the  pictograms 
or  the  SP-1100  and  you  require  more  light  output 
then remove the lens that covers the LEDs.

Lens Removal

Remove  the  diffusor  and  then  by  pressing  the  test 
button briefly an operation test is initiated. The light 
source  and  the  emergency  circuit  of  the  device  are 
tested. The manual test can be conducted only if the 
mains  power supply  and  the  battery  are connected. 
During this test period the LAMP TEST LED will  blink. 
The  battery  must  have  adequate  charge.  This  test 
lasts for 3 seconds.

Manual Operational Test

2.   Always use in any case round mains cable, with a 

diameter  of  5-10mm  (H05RN-F  type  2x1mm²  or 
any  other  type,  at  least  equal  to  it’s  mechanical 
and electrical properties). ATTENTION!! The cable 

o

These  luminaires  are  used  indoors  (ta  40 C)  where 
emergency  light  is  needed.  Each  luminaire  must  be 
permanently  connected  to  mains  power  supply.  In 
normal operation the led strip lights and the battery 
is  charging.  In    case    of    a    mains    power    supply 
failure    the    luminaire    will    light  the  led  strip   
automatically  in  emergency  mode.  When  the  mains 
power    supply    is    restored  the  device  turns  to 
normal operation.

CN5:

  LED connector

CN4:

  LED connector

CN3:

  Battery connector

CN1:

  Maintained, Non maintained selection

KL1:

  Power connector

Connectors

6. 

I

s  not  allowed  to  discard  batteries  into 

t  i

common  trash  bins,  they  must  be  discarded 
only 

in  battery  recycling  points.  Do  not 

incinerate.

5.  In case of inactive use for a period greater than 2 

months, disconnect the battery by pulling out the 
battery’s connector. 

3.  The  device  must  be  connected  to  the  mains 

power  supply  through  a  circuit  breaker    that  is 
depends on the total line’s  power load.

4.  In  case  of  battery  replacement,  it  must  be 

replaced by the same type, by the manufacturer 
or a competent person.

                

must  not  be  deformed  in  any  way  (This 
requirement is important to ensure the ΙΡ rating).

General

Commissioning

During commissioning of the luminaire write the commissioning date on the battery.

A full duration test should be conducted after 24 hours of continuous charging. The test is initiated by isolating 

the mains power supply. Verify that the LED lamp is lit during the test period for at least the stated duration.

When  power  is  applied  to  the  unit  inspect  that  the  CHARGE  indicator  is  steady,  and  that  the  led  lamp  is  lit 

(maintained operation) or OFF (non-maintained operation)

After installation, a 24 hours charging cycle must be completed, in order to achieve the nominal autonomy.

2

5

6

Ν

 for neutral and 

L

 for live wire.

Installation Instructions

3

4

2

2

1

1

Power Connections

7

9

11

8

10

12

Install  the  included  tie  (if  needed)  to  fasten 
securely the power cables.

Battery Connection

This unit has replaceable batteries that can be replaced or changed by the manufacturer or a competent person.

1
1
1
1

Luminaire
Set of Pictograms
Mounting accessories
Manual

Package Contents

4.  Replace the removed parts (previous steps 1 and 2).

3.  Remove the old battery and place a new one of the same type and characteristics.

2.  Follow step 2 of the installation instructions and remove the reflector.

1.  Follow step 1 of the installation instructions and remove the diffusor.

It can be done only by a competent person and after the mains interruption

.

Battery Replacement

923500000_09_003

923500000_09_003

923500000_09_003

Non maintained

operation

Maintained

operation

Description

Indications LED Status

CHARGE

(green)

Charging
Emergency mode or
battery disconnected

Note:

Permanently

ON

Off

N

L

A

B

A

A

A

A

A

A

Attention!!

  The  6  plastic  latches  (A) 

must  be  secured  (click  sound).  This 
requirement  is  important  to  ensure 
the  IP42  rating.  Power  on  the 
luminary.

Mounting Methods

Oly luminaires can be surface mounted on walls or ceilings. For these mounted installations,  special 
accessories are included.

Wall

bottom

view

Wall installation

Ceiling installation

Ceiling

*  ATTENTION!!!  The  below  mounting  methods  can  be  done  after  request  of  the  necessary 

mounting accessories!!

Extra Mounting Methods *

Suspended ceiling installation 

with mounting accessory

A-3018

Suspended installation with A-3018 accessory

The  luminary  can  be  installed  in  a  suspended 
ceiling.

A marking panel (

SP-1100

) can be installed on the luminary pointing the desired direction.

Suspended ceiling installation 

with mounting accessories  

and marking panel

Ceiling installation 

with marking panel

Install  the  included  rubber  gasket  and  pass  through  the 
power cables.

1.  Fit  the  pictogram  you  need  to  the  diffuser,  be  careful  to 
secure it on the 3 plastic holders. 
2. Refit the diffusor with the pictogram.

Отзывы: