Automatic Autonomy Test

The  Automatic  Autonomy  Test  measures  the 
device’s  back  up  operation  and  emergency 
duration.  This  test  is  conducted  automatically 
every  6  months

In  order  to  be  performed,  the 

mains power supply and the battery should be 
connected  and  fully  charged

If  the  battery  is 

not fully charged

the test is postponed

 

until the 

battery  is  completely  charged.  If  during  this 
test,  the  autonomy  is  less  than  nominal,  the 
battery  fault  led  turns  on  continuously  and  the 
battery must be replaced. The test lasts for the 
selected autonomy.

Emergency Operation

The  autonomy  duration  of  battery  during 
emergency  mode  is  at  least  the  selected 
autonomy duration. During emergency mode, a 
light source test is also performed.

Resetting Errors

Hold the A-1900 card in TEST position for 10 to 
15 seconds in order to delete all LED indicated 
errors.  Then    the  device  enters  regular 

operation mode.

Indication  LED  status  (with  connected 
mains power supply).

Charge (Green LED) 

On:

 

Good charge condition.

Blink: 

Battery is charging.

Οff:

 

No battery 

(

No charging current 

or disconnected battery

).

Fault (Red LED)

 

Οn

 

:

 

Faulty  LED  strip  (must  be  replaced)  or 

emergency  circuit  (must  be  checked  by 
authorized personnel).

Blink

  (

With  Charge  LED  ON):

  Autonomy  or 

low  battery  problem 

(the  battery  must  be 

replaced).

Οff:

 

No fault.

ΑΤΤΕΝΤΙΟΝ!

!!

1.  Operations  for  installation,  maintainance  or 
testing  must  be  done  by  authorized  personnel 
only

.

2. The device must be connected to the mains 
power supply through a fuse dependent by the 
total amount of the line’s  power load.

3.  In  case  of  inactive  use  for  a  period  greater 
than  2  months,  disconnect  the  battery  by 
pulling out the battery’s connector. 
4. 

I

s  not  allowed  to  discard  batteries  into 

t  i

common  trash  bins,  they  must  be 
discarded  only 

in  battery  recycling 

points. Do not incinerate.

INSTALLATION INSTRUCTIONS

Test

 and 

Faults R

eset operations with the A-

1900  card  (not  included  and  available 

after

 

request). 

For 

lights

  test,  you  must  place  the 

card in front of the TEST indicator and remove it 
immediately.  For 

Autonomy  Test

,  you  must 

place the card in front of TEST 

and

 hold it for 5 

to 10 seconds.

To reset errors

 you must place the card in front 

of TEST by holding it for 

10

 to 1

5

 seconds and 

removing it.

Only  for  models  GR-750/ST/HP/LL  and  GR-
752/ST/HP/HL
*

15m: When the luminary is installed on a wall.

**17m: When luminary is installed on the ceiling.

GR-753/ST/LP/HL

220-240V      /50-60Hz
RATED POWER: 4.6W/4.8VA
BATTERY:3.6V/3Ah
LUMINOSITY: 300lm

IP54

t

40ºC

 

5-40ºC

 

 

MADE IN GREECE

8

1

0

X

1

A

F

TEST

INDICATORS
GREEN:CHARGE
RED:FAULT

A-1900

Mounting methods

BAU Light luminaries can be surface mounted on walls or ceilings. For these mounted installations,  
special accessories are included.

Wall

bottom 

view

Wall installation 

Ceiling installation

1

6

4

1  Place a flat blade screwdriver to the plastic hook and pull up
    gently to release the diffusor

.

2  

Remove the reflector.

3

  

Remove the led strip.

4  

Use the included mounting parts to mount the base plastic.

5  

Always use in any case round mains cable

,

 with a diameter

 

of 5

-

10mm (H05RN-F type 2x1mm²

    

or 

any 

other

 

type

,

 

at least 

equal 

to it’s mechanical and electrical properties). ATTENTION!! The

    cable must not be deformed in any way (This requirement is important to ensure the 

ΙΡ

 rating).

    Install

 

the included gasket in to the cable entry holes

 (verify that is not deformed)

. Make a hole in the

    center by using a small screwdriver. Pass the round cable through the gasket. Connect the mains
    cables to the respective terminal block

. Ν 

for neutral

L for live wire

6  The control of maintained or non maintained operation of the luminary is achieved through Switch 4 of

    DS1

.

 For maintained operation, switch number 4 must be in ON position. For non-maintained operation,

    switch number 4 must be in OFF position.
7  Refit the led strip minding the connection with the P.C.B. 

Warning!! 

The holes of the led strip must be

    fit in the projections of the base.
8

  

Place the battery’s connector to the corresponding connector on the P.C.B

.

9  

Refit the reflector (mind the correct orientation) and tighten the screws. Refit the diffusor (mind

    the correct orientation) and the luminary is ready to operate

.

The  selection  must  be  done  while  the 
luminaire is disconnected from AC and battery 
supplies.  The  selection  is  achieved  through 
Switches 2 & 3 of 

DS1

. Switch 1 is not used.

1h

ON

ON

ON

1

1

1

2

2

2

3

3

3

4

4

4

3h

(default position)

8h

ON

1 2 3 4

ON

1 2 3 4

Maintained operation

Non-maintained operation

General

General

9

8

7

923

753000_09_00

4

923

753000_09_00

4

NOTE!!  After finishing the installation you must power the luminaire at least for 24 hours for battery 
charging to perform the named autonomy. 