Automatic Autonomy Test
The Automatic Autonomy Test measures the
device’s back up operation and emergency
duration. This test is conducted automatically
every 6 months
.
In order to be performed, the
mains power supply and the battery should be
connected and fully charged
.
If the battery is
not fully charged
,
the test is postponed
until the
battery is completely charged. If during this
test, the autonomy is less than nominal, the
battery fault led turns on continuously and the
battery must be replaced. The test lasts for the
selected autonomy.
Emergency Operation
The autonomy duration of battery during
emergency mode is at least the selected
autonomy duration. During emergency mode, a
light source test is also performed.
Resetting Errors
Hold the A-1900 card in TEST position for 10 to
15 seconds in order to delete all LED indicated
errors. Then the device enters regular
operation mode.
Indication LED status (with connected
mains power supply).
Charge (Green LED)
On:
Good charge condition.
Blink:
Battery is charging.
Οff:
No battery
(
No charging current
or disconnected battery
).
Fault (Red LED)
Οn
:
Faulty LED strip (must be replaced) or
emergency circuit (must be checked by
authorized personnel).
Blink
(
With Charge LED ON):
Autonomy or
low battery problem
(the battery must be
replaced).
Οff:
No fault.
ΑΤΤΕΝΤΙΟΝ!
!!
1. Operations for installation, maintainance or
testing must be done by authorized personnel
only
.
2. The device must be connected to the mains
power supply through a fuse dependent by the
total amount of the line’s power load.
3. In case of inactive use for a period greater
than 2 months, disconnect the battery by
pulling out the battery’s connector.
4.
I
s not allowed to discard batteries into
t i
common trash bins, they must be
discarded only
in battery recycling
points. Do not incinerate.
INSTALLATION INSTRUCTIONS
Test
and
Faults R
eset operations with the A-
1900 card (not included and available
after
request).
For
lights
test, you must place the
card in front of the TEST indicator and remove it
immediately. For
Autonomy Test
, you must
place the card in front of TEST
and
hold it for 5
to 10 seconds.
To reset errors
you must place the card in front
of TEST by holding it for
10
to 1
5
seconds and
removing it.
Only for models GR-750/ST/HP/LL and GR-
752/ST/HP/HL
*
15m: When the luminary is installed on a wall.
**17m: When luminary is installed on the ceiling.
GR-753/ST/LP/HL
220-240V /50-60Hz
RATED POWER: 4.6W/4.8VA
BATTERY:3.6V/3Ah
LUMINOSITY: 300lm
IP54
t
40ºC
a
t
5-40ºC
MADE IN GREECE
8
1
0
X
1
A
F
TEST
INDICATORS
GREEN:CHARGE
RED:FAULT
A-1900
Mounting methods
BAU Light luminaries can be surface mounted on walls or ceilings. For these mounted installations,
special accessories are included.
Wall
bottom
view
Wall installation
Ceiling installation
1
6
4
1 Place a flat blade screwdriver to the plastic hook and pull up
gently to release the diffusor
.
2
Remove the reflector.
3
Remove the led strip.
4
Use the included mounting parts to mount the base plastic.
5
Always use in any case round mains cable
,
with a diameter
of 5
-
10mm (H05RN-F type 2x1mm²
or
any
other
type
,
at least
equal
to it’s mechanical and electrical properties). ATTENTION!! The
cable must not be deformed in any way (This requirement is important to ensure the
ΙΡ
rating).
Install
the included gasket in to the cable entry holes
(verify that is not deformed)
. Make a hole in the
center by using a small screwdriver. Pass the round cable through the gasket. Connect the mains
cables to the respective terminal block
. Ν
for neutral
,
L for live wire
.
6 The control of maintained or non maintained operation of the luminary is achieved through Switch 4 of
DS1
.
For maintained operation, switch number 4 must be in ON position. For non-maintained operation,
switch number 4 must be in OFF position.
7 Refit the led strip minding the connection with the P.C.B.
Warning!!
The holes of the led strip must be
fit in the projections of the base.
8
Place the battery’s connector to the corresponding connector on the P.C.B
.
9
Refit the reflector (mind the correct orientation) and tighten the screws. Refit the diffusor (mind
the correct orientation) and the luminary is ready to operate
.
The selection must be done while the
luminaire is disconnected from AC and battery
supplies. The selection is achieved through
Switches 2 & 3 of
DS1
. Switch 1 is not used.
1h
ON
ON
ON
1
1
1
2
2
2
3
3
3
4
4
4
3h
(default position)
8h
ON
1 2 3 4
ON
1 2 3 4
Maintained operation
Non-maintained operation
General
General
9
8
7
923
753000_09_00
4
923
753000_09_00
4
NOTE!! After finishing the installation you must power the luminaire at least for 24 hours for battery
charging to perform the named autonomy.
Ceiling