84.
Attach
Front
and
Rear Facia
(angle cut on ends), to Facia Cleats on Long Roof Side, with
10 - 1 1/2” finishing nails per piece. Line up the
82 1/8” long Facia piece so Facia end lines up
with Batten and Rafter ends.
85.
Attach
Side Facia (71 1/2” long)
to roof rafter ends. There are 2 Side Facia pieces per side.
Secure with 8 - 1 1/2” finishing nails per piece. Side Facia will sandwich Front and Rear Facia.
Do a dry run, lining up
Front/Rear/Side Facia
to confirm positioning
prior to attaching.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 40