Note:
The floor will be flipped over and the floor
runners will sit on your foundation. It is important
to note, that having a level foundation is critical.
Choosing a foundation will vary between regions.
Typical foundations can be concrete pads or patio
stones positioned underneath the floor runners.
Concrete Slab
Foundation
Foundations
Use chalk line to mark
location of mid joists for
interior screws.
Front
12.
With Plywood positioned
correctly on floor framing, attach
with
1 1/4” Screws
. Use screws
every 16” around perimeter of each
large floor section and 3 screws
through each mid joists. Adjust for
smaller floor sections accordingly.
11.
Position parts
1D
&
1E - Plywood Floor
on top of completed
floor joists. Plywood will sit flush with outside of floor joist frame.
Parts
1D -
Plywood Floor - Large
(5/8” x 45 3/8” x 74 7/8”)
x 3
1E -
Plywood Floor - Small
(5/8” x 45 3/8” x 20 7/8”)
x 3
Hardware
S2
- 1 1/4” Screws
x 100 total (approx.)
10.
With Floor Runners attached, carefully flip the floor over and place on your foundation.
Caution:
you will need 2 people to assist you. Be careful when laying floor down not to bend or twist floor.
When in place, level floor completely.
9.
Complete remaining Floor Runners.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 10