94.
Attach both the
Horizontal Door Trim
(1/2” x 2 1/2” x 32”)
and
Horizontal Narrow
Wall Trim
(1/2” x 2 1/2” x 8 3/4”)
with 4 and 2
finishing nails.
95.
Locate
Horizontal Gable Trim
(1/2” x 4 1/2” x 85 1/2”) for both front and
rear of shed.
96.
Position Horizontal Gable Trim so flush
with outside edge of Wide Trim and top of
Vertical Door Trim. Use 8 - 1 1/2” finishing nails
per piece to secure. Complete both sides.
Angle cut
on 1 end
97.
Assemble
Flower Box
Kit
with Assembly
Instructions included on Page 41. Position com-
pleted Flower Box below bottom of window trim
and secure with 2 - 2 1/2” screws. Screw from
inside of box into the center wall stud. Attach
second screw 2” underneath first screw and
once again into the wall stud. Install Flower
Box Kits underneath each window.
flush
98.
Attach Interior
Vertical Door Stops
(1/2” x 2 1/2” x 72”) to door framing from inside of shed.
Use 4 - 2” screws to secure each Stop. Stops should overlap door by approximately 1/2”.
Door Stops
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 39