background image

8x4 GARDENSAVER WITH SLIDING DOOR AND METAL ROOF HARDWARE PACKAGE

Door Handle x 1

Square Drive Bit

Hardware Kit 

(Provided)

Safety Glasses

Work Gloves

Safety Equipment Required 

(Not Provided)

Ladder

Screw Gun/Drill

Tape Measure

Hammer

Wood Clamp

Level

Pliers

Tools Required 

(Not Provided)

1/8” & 1/2” Drill Bits

Utility Knife

1 1/2” 

Finishing Nail

245 Pcs.

Black Hasp x 1

Roller Assembly x 2

Torx Drive Bit

x 14

1/4” x 2” long

Metal Roof Screw

Metal Roof Hanger x 3

x 1

1/4” Nut Driver

Y2 - 90° Metal 
Bracket (Roof)

x 4

 Silicon Caulking (1)

2 1/2”

1 1/4”

3/4”

 

175 Pcs.

140 Pcs.

12 Pcs.

Black Headed

6 Pcs.

1 1/2”

4”

8 Pcs.

Torx Screws

3”

15 Pcs.

  Toll Free 1-888-658-1658              www.outdoorlivingtoday.com        [email protected]

Page 5

Содержание GS84-SLIDER-METAL-FJ

Страница 1: ...e provided free of charge after the 30 day grace period All structures purchased from Outdoor Living Today are covered for a period of one year for defects in manufacturing and workmanship Costs incur...

Страница 2: ...ide on the type of foundation you will be using Concrete slab or 4 6 inches of crushed gravel with paver stones or 4x4 stringers You can nd the footprint for your shed on Page 3 of your Assembly Manua...

Страница 3: ...d of floor frame Saves money on materials easy to level and work with Gravel with Patio Paver Stones Excavate at least 6 deep and 6 wider than floor frame on each side 1 0 Cubic Yards of gravel requir...

Страница 4: ...Step 47 D Miscellaneous Section Skirting Trim Door Facia Misc Parts 4 x 4 x 45 Bottom Skirting Finger Jointed 2 x 4 x 45 1 4 Front Bottom Skirting Steps 49 51 6 x 2 x 36 Corner Filler Trims 2 x 2 x 36...

Страница 5: ...iers Tools Required Not Provided 1 8 1 2 Drill Bits Utility Knife 1 1 2 Finishing Nail 245 Pcs Black Hasp x 1 Roller Assembly x 2 Torx Drive Bit x 14 1 4 x 2 long Metal Roof Screw Metal Roof Hanger x...

Страница 6: ...nel Small gap between bevel siding and window trim Dab of caulking Strip of roofing paper over apex of roof panels Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page...

Страница 7: ...o flush with framing 2 When correctly positioned attach each Joist with 4 2 1 2 Screws 2 per end You can find the Square Drive Bit for the screws in with the Hardware Kit Bag Front of GardenSaver Door...

Страница 8: ...n not to bend or twist floor Note Having a level foundation is critical Choosing a foundation will vary between regions Typical foundations can be concrete pads or patio stones positioned underneath t...

Страница 9: ...re flush with framing Door Header Short Important Pilot hole ALL 2x3 Wall Studs with 1 8 drill bit prior to screwing This will make it much easier to attached together Pilot Hole first Extendor Wall C...

Страница 10: ...ioned correctly locate 2nd Solid Wall Panel and place in corner Wall Plate Flush with floor frame Do not align wall siding to floor Align wall plate to outside of floor frame 12 Butt both vertical wal...

Страница 11: ...attach both wall panel studs together as per Step 12 with 3 2 1 2 Screws 14 With Rear Wall Panel in place position other side wall panel on floor as per Step 10 11 Rear Wall Panel 15 Secure side wall...

Страница 12: ...tach short header using 2 2 1 2 Screws as shown above 18 Locate Front Left Corner Filler Trims 2 3 4 x 2 1 2 x 36 and Door Jamb 1 1 2 x 3 3 8 x 73 Attach both Fillers with 4 1 1 2 Finishing Nails as s...

Страница 13: ...l extendor and align as shown above Attach with 3 1 1 2 Finishing Nails to top wall framing There are left right top siding pieces Use rough surface side out Place finished wall extendor on side wall...

Страница 14: ...extendor framing flush with inside edge of Header Overhanging siding on front of extendor will rest in notch of Header 1 4 recess 25 Attach Wall Extendor to both the Angled Wall Extendor framing and t...

Страница 15: ...ear Wall framing To help strengthen the Rear Walls there is a short and a long wall cleat which meet off center from the seam between walls Attach Cleats with 8 1 1 4 Screws 27 With Extendor Walls att...

Страница 16: ...now will make it easier to install roof section 99 1 4 29 Position and attach Front Right Corner Filler Trims 2 3 4 x 2 1 2 x 36 with 4 1 1 2 Finishing Nails per piece Attach Front Top Corner Filler T...

Страница 17: ...ligned correctly on the floor Refer to Step 11 Wall siding should overhang floor while 2x3 wall plates should sit flush with floor Bottom Wall Optional Caulking seams will help prevent moisture from e...

Страница 18: ...ve Measure and attach remaining Soffit Rafter connections using 2 1 1 4 screws per rafter soffit Front Soffit Boards 2 Rear Soffit Boards 2 48 21 3 4 21 3 4 96 A B C Rear Soffit Mid Rafter Mid Rafter...

Страница 19: ...and Rear Soffits will sit approximately 1 8 away from wall siding This can vary slightly 32 Carefully flip completed Rafter Section over so Front Soffit is facing the front and place on SpaceSaver wa...

Страница 20: ...framing at front of shed and inside Rear Wall framing at rear of shed behind Horizontal Wall Cleats Front 37 Position first row of Roof Battens 3 4 thick x 3 1 2 wide x 50 long x 2 on front of roof r...

Страница 21: ...hed Batten Spacers via the same method as Step 37 Attach a second row of Batten Spacers flush with the bottom edge of this middle Batten row via the same method as Step 38 40 Locate lower row of Roof...

Страница 22: ...e x 58 1 2 long Identical To temporarily help hold the Metal Roof Panel in place hook a Metal Roof Hanger onto the lower Batten approximately where the center of the first Panel will be Place the firs...

Страница 23: ...ng on your personal preference Metal roof Panels should overlap each other 43 Overhang the Metal Roof Panels past the Battens on the sides by approximately 3 4 The overhang on front and back will be s...

Страница 24: ...complete Metal Ridge Caps in later steps Note Metal Roof Hangers will need to be removed in Step 47 45 Once Metal Roof is spaced correctly from side toside and top to bottom lift panels up and run a...

Страница 25: ...ishing Nails per piece Secure lower front Batten row be careful not to overtighten 47 Before fully fastening Metal Roof Panels down remove the Metal Roof Hangers and insert Foam Enclosures between Met...

Страница 26: ...first and attach with 4 1 1 2 Finishing Nails per piece Front Metal Ridge Cap 2 Side Front Corner Trim 2 Front Corner Trim 2 Front Facia 2 Rear Corner Trim 2 Front Bottom Skirting 2 Lower Door Track...

Страница 27: ...tached later There will be two 36 long fillers per corner Position with a slight gap in the middle and attach with 4 1 1 2 Finishing Nails per piece Skirting meets flush in center Skirting meets flush...

Страница 28: ...e same 5 1 2 Side Skirting 55 To completely trim out rear corners locate Side Rear Corner Trims 1 2 x 2 1 2 x 80 and Rear Corner Trims 1 2 x 5 1 2 x 79 Align and attach as per Step 54 53 To Trim out f...

Страница 29: ...with 8 1 1 2 Finishing Nails aligning tight underneath soffit and center on seam 57 Locate Aluminum Door Track and position above doorway evenly spaced between wide front corner trim Ensure Track is...

Страница 30: ...rew per bracket to hold in place Attach 2nd bracket with another 1 1 2 Torx Screw Check level once again Complete attachment of remaining Torx Screws on brackets of Track 59 Locate Sliding Door and fl...

Страница 31: ...2 1 2 12 1 2 60 Locate Roller Assemblies Before attaching to top of doors assemble the units as shown above Attach two Roller Assemblies onto door with 4 1 1 4 Screws per Assembly center on the door f...

Страница 32: ...r Door Tracks and Door Stops Center Door Track side to side and resting on Long Floor Runners Bottom of Door Stops and Door Tracks should be flush with each other Secure Door Tracks to shed with 9 3 s...

Страница 33: ...ill attachments IMPORTANT Slide door back and forth to confirm door slides freely prior to attaching Top Track Overlay Track Brackets are slotted so door position can be adjusted horizontally as well...

Страница 34: ...rack Check level before securing with 6 4 Screws Edge of overlay has been pre drilled for screws 66 Locate Top Track Overlay Front 3 4 x 5 1 2 x 87 3 4 Position front overlay underneath sill Attach wi...

Страница 35: ...against Rafter Facia Nailing Strip Align so Front Facia caps Side Facia and then attach the front with 6 1 1 2 Finishing Nails Attach side with 5 1 1 2 Finishing Nails securing them into the nailing...

Страница 36: ...Metal Ridge Caps 2 pieces 60 long on top of metal roof in the front Insert Foam Enclosures underneath Ridge Caps Evenly space from side to side allowing caps to overlap each other Overhang the cap ap...

Страница 37: ...1 4 Screws Caulk gap between siding and window at top This requires a large amount of caulking but is important to fill Later Window Trims will be installed to hide caulking 74 Position Window Trim a...

Страница 38: ...ing 3 Motor Freight Delivery 4 Quality of Materials 5 Assembly Manual 6 Overall Satisfaction The materials contained in this Assembly Manual may be downloaded or copied provided that ALL copies retain...

Отзывы: