8.
Position Plywood so it sits almost flush with outside of floor joist framing (see
Note
). When correctly
positioned, attach to all floor joists with approximately
24 -
1 1/4” Screws
. Use screws every 16”.
B. Wall Section
Exploded view of all parts necessary to
complete the Wall Section. Identify all parts
prior to starting.
Angled Wall
Extendors (2)
Door Header - Long
Solid Wall
Panel (4)
Wall Plate (5)
Door Jamb
Solid Front Wall
Panel - 73” high
Horizontal
Wall Cleats
Wall Extendors (2)
Wall Plate
9.
Locate 5
Solid Wall Panels
and 5
Wall Plates
(1 1/2” x 2 1/2” x 45 1/2”)
.
Attach Plates to
bottom of studs of each wall panel with
3 - 2 1/2” Screws
. Position so plates are flush with framing.
Door Header
- Short
Note:
Plywood is cut slightly smaller than
floor framing. Keep plywood seams tight.
Important:
Pilot hole ALL 2x3 Wall
Studs with 1/8” drill bit prior to
screwing. This will make it much
easier to attached together.
Pilot Hole
first.
Extendor Wall
Cleats (2)
Extendor Top Siding
piece (2)
7/8” thick Filler Trim
3/4” thick Filler Trim
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 9