18.
Continue positioning and securing wall panels around your
floor. Attach wall studs together as per
Step 16.
Be sure that rear
wall panels fit between the side wall panels (sandwiched).
Do Not Attach
Walls To Floor
Until Step 25.
16.
Position a 2nd
Solid Wall
into place on plywood floor. Butt both vertical wall studs of side and
rear walls together and attach with
3 - 2 1/2” screws
. Screw at the bottom, middle and top of stud to
secure properly.
Rear Solid W
all
Side Solid W
all
17.
With the corner wall
attachment complete,
position a third wall
panel in place. Wall
siding should overhang
floor by approximately
1/2”. When positioned
correctly, attach both
rear wall panel studs
together as per
Step 16
.
Rear Solid W
all
2x3 wall framing flush
with floor framing.
Optional:
Caulking seams will
help prevent moisture from
entering at seam.
Caulking not
included in kit.
This will help the
longevity of your shed.
Side W
all Panels
Rear Wall Panels
19.
Complete all side
and rear wall attachments.
Front of Shed
Wall panel will
sit flush with
floor framing at
Front of shed.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 12