31.
The gable should be centered sideways (left to right) on the top plate.
Hint:
use a straight edge
to check the angle of the gable framing and top plate. Both angles should line up. Adjust gable
accordingly. Temporarily attach Gable to walls to top plate with
2 - 2” screws
. Screw from the
bottom of gable framing down into Top Plate and Wall. Gables may need slight adjustment in
Step 44
and then will be completely attached
with an additional 6 - 2” screws.
32.
Complete positioning and attachment of front gable as per
Step 29-31.
straight edge
Flashing overhangs
wall siding.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 17