Parts (Steps 24)
Door Header
(2” x 3 1/2” x 45 1/2”)
x 1
Hardware (Steps 24)
S1
- 2 1/2” Screws
x 4 total
24.
Position and attach
Door Header
to
Door Jamb
and
Narrow Wall Panel
top framing. Header should sit
flush with Door Jamb and Outside of Narrow Wall Panel
Siding Attach with
4 - 2 1/2” screws
..
Header has notch in edge that is
positioned to the top and facing outside.
25.
When all walls are attached together, check alignment with the floor.
Bottom wall framing should sit flush with outside of floor joists.
Confirm 32”
wide door opening at bottom.
When positioned correctly, fasten bottom wall
plates to floor using
4 - 2 1/2” screws
per wall panel.
Bottom Wall
Framing
Confirm Doorway Opening is 32” at top and bottom.
Angle
screws into perimeter
Floor Joists.
125 1/4”
125 1/4”
Advice:
Prior to fastening walls and installing
rafters, take time to confirm your walls are level,
square and plumb.
Measure diagonal at top and bottom of walls
corner-to-corner. This should be approximately
125 1/4”. More importantly, if measurements
are not within 1/4”, your walls are not square.
Adjusting now will make it easier to assemble
the roof section later
.
Caulking
Optional:
Caulking seams
between bottom wall plates and
floor will help prevent moisture
from entering you shed.
Caulking
not included in kit.
This will help
the longevity of your shed.
32”
Hardware (Steps 25)
S1
- 2 1/2” Screws
x 32 total
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 14