46.
Using
4 - 2” Metal Screws
and
1/4” Nut Driver
(included), partially secure
Metal Roof Panels
down to the middle
Batten
row. Only fasten screws half way so the
Metal Roof Hangers
can be
removed. Metal screw is self-tapping, screw into the center of Battens.
Eight more
2” Metal Screws
will be required to further secure
Metal Roof Panels
and to complete
Metal Ridge Caps
in later steps.
Note:
Metal Roof Hangers will
need to be removed in
Step 47
.
45.
Once Metal Roof is spaced correctly from side-toside and top-to-bottom, lift panels up and run a
bead of caulking down the overlapping seams of each panel to seal the joints. You will likely need
assistance from a helper in this step.
Bead of Caulking
Loosely attach middle row before
removing Metal Roof Hangers.
Screw into center of Battens.
Screw into Peak
not valley.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 24