background image

Congratulations on assembling 
your 6x6 Maximizer Storage Shed!

Note;

 Our Sheds are shipped as an unfinished product.  If exposed to the elements, the western red 

cedar lumber will weather to a silvery-gray color. If you prefer to keep the cedar lumber looking  
closer to the original color, we suggest that you treat the wood with a good oil base wood stain.  You 
may also wish to paint your new shed rather than stain it.  In both cases we recommend that you  
consult with a paint and stain dealer in your area for their recommendations.

We hope your experience  
assembling your 6x6 Maximizer 
Storage Shed has been both  
positive and rewarding. 
 
We value your feedback and 
would like to hear back from you 
on how well we are doing in the 
following areas: 
 

1. Customer Service 
2. On Time Shipping 
3. Motor Freight Delivery 
4. Quality of Materials 
5. Assembly Manual 
6. Overall Satisfaction. 

 
Please call, write or email us at: 

Canadian Address 
9393 287th Street 
Maple Ridge, British Columbia 
Canada     V2W 1L1

United States Address 
P.O. Box 96 
Sumas, Washington 
USA    98295

Outdoor Living Today

The materials contained in this Assembly 
Manual may be downloaded or copied 
provided that ALL copies retain the  
copyright and any other proprietary 
notices contained on the materials. No 
material may be modified, edited or 
taken out of context such that its use 
creates a false or misleading statement 
or impression as to the positions,  
statements or actions.

Toll Line: 1.888.658.1658         |      Fax: 1.604.462.5333      |      [email protected]

Page 33

Содержание 6x6 Maximizer Storage Shed

Страница 1: ...er s responsibility and should be abided by in high or gusty wind conditions it is advisable to keep the structure securely grounded have a regular maintenance plan to ensure screws doors windows and...

Страница 2: ...ny to ensure there are no gas or electric lines buried in the area before digging Decide on the type of foundation you will be using Concrete slab or 4 6 inches of crushed gravel with paver stones or...

Страница 3: ...easy to level and work with Gravel with Patio Paver Stones Excavate at least 6 deep and 6 wider than floor frame on each side 1 0 Cubic Yards of gravel required approximately 9 wheelbarrows 12 patio p...

Страница 4: ...ht Roof Panels 41 Shingles overhanging plywood on right side 3F 4 Roof Facia Cleats 3 4 x 1 1 2 x 42 3G 6 Long Roof Filler Shingles 3H 2 Short Roof Filler Shingles 3I 12 Roof Ridge Caps 3J 4 Miscellan...

Страница 5: ...cs Individual Hardware Components not actual size Screws and Nails Cane Bolt M 1 Pc 6 x 6 Maximizer HARDWARE PACKAGE 2 1 2 2 1 1 4 2 3 4 1 1 2 Finishing Nail Square Drive Bit 3 A 1 Pc F 250 Pcs J 26 P...

Страница 6: ...off dirt from walls Brush off snow from roof regularily Routinely remove needles and leaves from roof Painting Staining Your cedar shed if left untreated will weather to a silvery grey colour Paintin...

Страница 7: ...te Floor Footprint is 70 wide x 75 deep Concrete Pad optional foundation method 1 Lay out one Floor Frame Section Part 1A and Floor Joists 2 1 1 2 x 3 1 2 x 72 Part 1B as illustrated above Space joist...

Страница 8: ...s shown below Screw sections together with 8 2 1 2 screws Part B Alternate screw location Use a wood clamp to keep frames together while screwing 5 When completed your floor footprint should be 70 wid...

Страница 9: ...l in both directions to confirm square Both should be approximately 102 1 2 Adjust floor if necessary Concrete slab foundation Foundations 6 Attach Floor Runners 3 1 1 2 x 3 1 2 x 70 Part 1C to comple...

Страница 10: ...s 2 pcs Part 2H Door Jamb 2 pcs Part 2C Bottom Wall Plate 6 pcs Part 2B Bottom Wall Plate 12 Carefully lay a Wall Panel Part 2A face down Locate a Wall Plate 1 1 2 x 2 1 2 x 35 Part 2B and position pl...

Страница 11: ...floor with the butt of the siding overhanging the floor Note Siding will overhang the floor by approx 7 8 Important initial wall orientation is important If wall not aligned correctly you may experien...

Страница 12: ...at top and screw in the middle and bottom of framing Screw on a slight angle into the meat of both frames 17 With the corner wall attachment complete position a second side wall panel in place Option...

Страница 13: ...per Steps 16 18 Rear Wall panel framing aligned flush with floor framing Side Floor Framing R e a r W a l l 18 Align vertical wall frames of both side wall panels together and attach with 3 2 1 2 scre...

Страница 14: ...hed filler strip is facing to the outside Position outside of Jamb flush with outside of siding At the floor Jamb should be flush with floor framing 22 Attach Door Jamb to vertical wall stud with 4 2...

Страница 15: ...on both ends 3 4 x 2 1 2 x 75 Part 2E on top wall framing Top plate should be evenly spaced from front to back and aligned flush with the inside of top wall framing Attach to framing with 4 2 screws...

Страница 16: ...raming Confirm 64 Wide between Door Jambs Caulking Optional Caulking seams will help prevent moisture from entering at seam Caulking not included in kit Angle screws into perimeter Floor Joists Import...

Страница 17: ...e Gable Wall Part 2H so gable framing sits flush with the inside of the top plate Center from front to rear using a Straight Edge to confirm angle of gable frame and Top Plate line up Adjust gable acc...

Страница 18: ...1 2 x 45 Part 3A 1 Ridge Board 3 4 x 4 1 2 x 70 Part 3B and 1 Soffit 1 2 x 4 1 2 x 70 Part 3C Evenly space out Rafters and lay out as illustrated to the left on a flat level surface 3 4 thick Ridge Bo...

Страница 19: ...dge Board and Soffit prior to screwing to prevent splitting Soffit Ridge Board Soffit 35 17 1 2 33 Attach end of Soffit Board flush to ends of outside rafters with 2 1 1 4 screws Part C per rafter end...

Страница 20: ...n rafter section is correctly positioned outside rafters will sit equally on gable framing and soffit will sit approximately 1 8 to 1 4 away from wall panels 36 Slide rafter section up on gable framin...

Страница 21: ...ry pushing rear wall and Door Header closer together from outside Before moving on with further steps confirm your shed is square at wall height by checking the diagonal distance of the top walls on t...

Страница 22: ...with 4 1 1 4 Screws Part C evenly spaced Attach remaining cleats to panels The cleat provides for a greater nailing surface later when you attach side facia Roof Plywood flush with rafter end 1 screw...

Страница 23: ...h filler and roof above exposure line with 1 2 1 2 Screw Part B Only attach first long filler shingle at this point 1 screw at top into ridge board 47 Position and attach front side roof panels as per...

Страница 24: ...il half roof is complete From opposite side position and attach ridge caps as described above Score cut 1 ridge cap to 12 or to fit in the center of roof Attach center cap with 4 7 8 Shingle Nails Par...

Страница 25: ...g from exploded drawing Interior Cane Bolt Door Stops Door Threshold Exploded view of all parts necessary to complete the Miscellaneous Section Identify all parts prior to starting Rear Filler Trim 2...

Страница 26: ...ar Bottom Skirting 1 2 x 4 1 2 x 34 3 4 Part 4C with 4 1 1 2 Finishing Nails Part F per piece 54 Locate both 3 4 x 4 3 8 x 79 Door Trims Part 4A Position a Trim so it covers the Door Jambs and is flus...

Страница 27: ...th 6 1 1 2 Finishing Nails Part F Door Trim 4A will cap side trim as shown above 60 Attach Horizontal Gable Trims 4 pcs 1 2 x 4 1 2 x 37 7 8 Part 4H with 4 1 1 2 Finishing Nails Part F per piece Posit...

Страница 28: ...e of plywood roof sheathing and roof cleat with 6 1 1 2 Finishing Nails Part F 64 Attach Front and Rear Facia 3 4 x 3 1 2 x 79 1 2 Part 4L to ends of rafters with 10 1 1 2 Finishing Nails Part F Front...

Страница 29: ...on side 1 2 gap at bottom 68 With door aligned attach door hinge to door trim with 3 2 Black Headed Screws Part I Hint Do not attach all the 2 screws in each hinge until both doors are positioned corr...

Страница 30: ...art 4Q with 6 1 1 2 Finishing Nails Part F Leave small gap to allow for proper door opening and closing Above Door Trim 71 Attach Horizontal Door Stop 1 1 2 x 2 1 2 x 64 Part 4R with dado facing out t...

Страница 31: ...rame left door from outside using 6 2 screws Part E Position on inside edge of door frame so flange overlaps door frame by 1 Door Flange 72 Attach Door Threshold 3 4 x 2 1 2 x 62 1 2 Part 4S with 4 2...

Страница 32: ...Handles Part K with 3 4 Black Screws Part J 2 Screws 2 Screws 3 4 Screw 76 Position Door Stops 1 2 x 2 1 2 x 71 Part 4U in each corner screwing into door framing using 6 2 screws Part E Before attachi...

Страница 33: ...back and would like to hear back from you on how well we are doing in the following areas 1 Customer Service 2 On Time Shipping 3 Motor Freight Delivery 4 Quality of Materials 5 Assembly Manual 6 Over...

Отзывы: