
33.
Attach Ridge Board to ends of both outside rafters with
2 - 2”
screws (Part E)
per end. Drill 1/8” pilot holes in Ridge Board to
prevent splitting.
Measure and position interior Rafters as illustrated below. Double up
center rafters and screw together with
2 - 2 1/2” screws (Part B)
first.
When positioned correctly, attach Ridge Board to remaining rafters with
2 - 2” screws (Part E)
/rafter end.
Ridge Board
Note: Ridge Board
must be aligned to
bottom of rafter end
Important:
Pilot Hole Ridge
Board and Soffit
prior to screwing
to prevent splitting!
Soffit
Ridge Board.
Soffit
35”
17 1/2”
34.
Attach end of Soffit Board flush to ends of outside rafters with
2 - 1 1/4” screws (Part C)
per rafter end.
Drill pilot hole in soffit ends to
prevent splitting.
Complete both outside rafter / soffit connections first. Measure
and position interior rafters as illustrated above. When positioned
correctly, attach soffits to remaining rafters with
2 - 1 1/4” screws (Part C)
/rafter.
35.
Complete 2nd
Rafter section now
as per
Steps 32 - 34.
1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 17
Double up center rafters
and attach together with
2 - 2 1/2” screws