OLT 6x6 Apex Скачать руководство пользователя страница 15

30. 

Temporarily attach gable walls to top plate with 

2 - 2” screws (Part E). 

Screw from the bottom

of gable framing down into top plate. Gables may need slight adjustment in 

Step 40 

and then be 

completely attached with an additional 

6 - 2” screws (Part E).

Position 2nd Gable on side walls.

29.

Locate and place 

Gable Wall (Part 2H)

so gable framing sits flush with the inside of the top plate.

Center from front to rear using a Straight Edge to confirm angle of gable frame and Top Plate line up.
Adjust gable accordingly. From the outside, make sure gable flashing overhangs wall siding.

Gable Frame

Straight Edge

Gable Flashing

31. 

Position and temporarily attach 2nd Gable as per 

Steps 28-29.

Wall Framing

Gable Wall

Temporarily attach gable walls to top plate.
Slight adjustment may be required later

1-888-658-1658                        www.outdoorlivingtoday.com            [email protected]

Page 15

Содержание 6x6 Apex

Страница 1: ...ural and building code requirements are solely the customer s responsibility and should be abided by in high or gusty wind conditions it is advisable to keep the structure securely grounded have a reg...

Страница 2: ...t 3D 2 Left Roof Panels 41 Shingles overhanging plywood on left side 3E 2 Right Roof Panels 41 Shingles overhanging plywood on right side 3F 4 Roof Facia Cleats 3 4 x 1 1 2 x 42 3G 6 Long Roof Filler...

Страница 3: ...day com Page 3 Door Handle K 2 Pcs Exterior Barrel Bolt L 1 Pc Tee Hinge H 6 Pcs Individual Hardware Components not actual size Screws and Nails actual size Cane Bolt M 1 Pc 6 x 6 Apex HARDWARE PACKAG...

Страница 4: ...piece of work you can do to make the project go smoothly Most of this work can be done prior to your shed arriving 4x4 Pressure Treated Beam Foundation You can build directly on pressure treated beam...

Страница 5: ...ng Note Floor Footprint is 70 wide x 75 deep Concrete Pad optional foundation method 1 Lay out one Floor Frame Section Part 1A and Floor Joists 2 1 1 2 x 3 1 2 x 72 Part 1B as illustrated above Space...

Страница 6: ...ames together as shown below Screw sections together with 8 2 1 2 screws Part B Alternate screw location Use a wood clamp to keep frames together while screwing 5 When completed your floor footprint s...

Страница 7: ...agonal in both directions to confirm square Both should be approximately 102 1 2 Adjust floor if necessary Concrete slab foundation Foundations 6 Attach Floor Runners 3 1 1 2 x 3 1 2 x 70 Part 1C to c...

Страница 8: ...edge Gable Walls 2 pcs Part 2G Door Jamb 2 pcs Part 2C Bottom Wall Plate 6 pcs Part 2B Bottom Wall Plate 12 Carefully lay a Wall Panel Part 2A face down Locate a Wall Plate 1 1 2 x 2 1 2 x 35 Part 2B...

Страница 9: ...ywood floor with the butt of the siding overhanging the floor Note Siding will overhang the floor by approx 7 8 Important initial wall orientation is important If wall not aligned correctly you may ex...

Страница 10: ...Start at top and screw in the middle and bottom of framing Screw on a slight angle into the meat of both frames 17 With the corner wall attachment complete position a second side wall panel in place O...

Страница 11: ...r as per Steps 16 18 Rear Wall panel framing aligned flush with floor framing Side Floor Framing R e a r W a l l 18 Align vertical wall frames of both side wall panels together and attach with 3 2 1 2...

Страница 12: ...ll sit flush to outside of each jamb when correctly installed 1 2 overhang on inside of wall framing 22 Install each door jamb to vertical wall framing with 7 3 screws Part D Evenly space 4 screws fro...

Страница 13: ...e cut on both ends 3 4 x 2 1 2 x 75 Part 2E on top wall framing Top plate should be evenly spaced from front to back and aligned flush with the inside of top wall framing Attach to framing with 4 2 sc...

Страница 14: ...s Part B per wall panel Bottom Wall Framing Confirm 64 Wide between Door Jambs Caulking Optional Caulking seams will help prevent moisture from entering at seam Caulking not included in kit 26 Complet...

Страница 15: ...ng sits flush with the inside of the top plate Center from front to rear using a Straight Edge to confirm angle of gable frame and Top Plate line up Adjust gable accordingly From the outside make sure...

Страница 16: ...x 3 1 2 x 45 Part 3A 1 Ridge Board 3 4 x 4 1 2 x 70 Part 3B and 1 Soffit 1 2 x 4 1 2 x 70 Part 3C Evenly space out Rafters and lay out as illustrated to the left on a flat level surface 3 4 thick Rid...

Страница 17: ...le Ridge Board and Soffit prior to screwing to prevent splitting Soffit Ridge Board Soffit 35 17 1 2 34 Attach end of Soffit Board flush to ends of outside rafters with 2 1 1 4 screws Part C per rafte...

Страница 18: ...8 When rafter section is correctly positioned outside rafters will sit equally on gable framing and soffit will sit approximately 1 8 to 1 4 away from wall panels 37 Slide rafter section up on gable f...

Страница 19: ...ards try pushing rear wall and Door Header closer together from outside Before moving on with further steps confirm your shed is square at wall height by checking the diagonal distance of the top wall...

Страница 20: ...4 x 1 1 2 x 42 Part 3G onto outside of each outside panel flush with plywood Attach with 4 1 1 4 Screws Part C evenly spaced Attach remaining cleats to panels The cleat provides for a greater nailing...

Страница 21: ...ps Do not attach further until Step 49 49 Slide in Long Filler Shingle Part 3F Attach filler and roof above exposure line with 1 2 1 2 Screw Part B Only attach first long filler shingle at this point...

Страница 22: ...ps until half roof is complete From opposite side position and attach ridge caps as described above Score cut 1 ridge cap to 12 or to fit in the center of roof Attach center cap with 4 1 1 4 Shingle N...

Страница 23: ...ed drawing Interior Cane Bolt Door Stops Door Threshold Exploded view of all parts necessary to complete the Miscellaneous Section Identify all parts prior to starting Rear Filler Trim 2 pcs Part 4D F...

Страница 24: ...nd Rear Bottom Skirting 1 2 x 4 1 2 x 34 3 4 Part 4C with 4 1 1 2 Finishing Nails Part F per piece 55 Locate both 3 4 x 4 3 8 x 79 Door Trims Part 4A Position a Trim so it covers the Door Jambs and is...

Страница 25: ...Nails Part F to secure Attach Side Front Wide Trims 1 2 x 4 1 2 x 77 1 2 Part 4G with 6 1 1 2 Finishing Nails Part F Door Trim 4A will cap side trim as shown above 61 Attach Horizontal Gable Trims 4...

Страница 26: ...4 1 1 2 Finishing Nails Part F 64 Attach Side Facia 3 4 x 3 1 2 x 46 Part 4K to edge of plywood roof sheathing and roof cleat with 6 1 1 2 Finishing Nails Part F 65 Attach Front and Rear Facia 3 4 x...

Страница 27: ...im with barrel of hinge tight to edge of door Complete both doors Bottom of Door 3 8 on side 1 2 gap at bottom 69 With door aligned attach door hinge to door trim with 3 2 Black Headed Screws Part I H...

Страница 28: ...64 Part 4Q with 6 1 1 2 Finishing Nails Part F Leave small gap to allow for proper door opening and closing Above Door Trim 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page...

Страница 29: ...ach Interior Door Flange 1 2 x 2 1 2 x 71 Part 4T Position on inside door frame left door from outside using 6 2 screws Part E Position on inside edge of door frame so flange overlaps door frame by 1...

Страница 30: ...Door Handles Part K with 3 4 Black Screws Part J 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 30 2 Screws 2 Screws 3 4 Screw 76 Position Door Stops 1 2 x 2 1 2 x 71 Part...

Страница 31: ...and would like to hear back from you on how well we are doing in the following areas 1 Customer Service 2 On Time Shipping 3 Motor Freight Delivery 4 Quality of Materials 5 Assembly Manual 6 Overall S...

Отзывы: