Select installation location considering piping and wiring connection after the Indoor Unit has
been hanged. Then decide the piping wiring leading direction.
Be sure to lead the refrigerant pipes, drain pipes and connection wires out to its connection
location before hanging the unit if the opening on the ceiling has been decided.
Confirm sizes of the indoor unit and ceiling opening with the attached installation paper
pattern. (Please fix the paper pattern below the body with M5X16 screws (4).
INDOOR UNIT INSTALLATION
6
SHAPE OF INDOOR UNIT
a.
hook and ceiling
distance between
b.height of panel ceiling sponge
c.distance between hook and indoor unit top
d.distance between ceiling and indoor unit top
e.height of indoor unit;
A.dimension of panel
Please select the space to install indoor unit according to the dimension show
above,then install correctly,and have enough space for maintenance.
B.dimension of ceiling cut-out
C.dimension of indoor unit.
BODY DIMENSION:830 230
830
BODY DIMENSION:830 310
830
Refrigerant pipe
Ceiling
D2=760
mm
C=835
mm
A=950
mm
D
3
=
6
2
5
m
m
8
3
5
m
m
B=
8
7
5
~
9
1
0
m
m
D
1
=
6
5
5
m
m
B=875~910
mm
D4=780
mm
a
=
1
1
0
~
1
2
5
m
m
1
6
0
m
m
Drainage pipe
1
6
0
m
m
c
=
1
9
0
1
5
0
m
m
e
=
2
8
0
2
4
0
m
m
b
=
5
~
2
0
m
m
d
=
3
0
0
~
3
1
5
2
6
0
~
2
7
5
m
m
Содержание OSH-T24HRK3
Страница 37: ......