3NB/3ND/3N0/3NK
2-1-1
2-1 Mechanical Construction
2-1-1 Bridge unit section
The bridge unit section consists of the parts shown in figure below and discharges paper conveyed from the
machine to the document finisher or DF right sub tray.
Figure 2-1-1 Bridge unit section
5
1
1
1
3
4
6
5
2
2
2
7
8
9
10
11
13
12
1. Paper conveying roller
2. Paper conveying pulley
3. Bridge conveying sensor1 (BRCS1)
4. Bridge conveying sensor2 (BRCS2)
5. Actuator(Bridge conveying sensor)
6. Eject roller 1
7. Eject pulley 1
8. Feedshift roller
9. Feedshift pulley
10. Bridge eject sensor (BRES)
11. Actuator(Bridge eject sensor)
12. Eject roller 2
13. Eject pulley 2
Service Manual Y113480-7
Содержание AK-730
Страница 1: ...SERVICE MANUAL Options DF 790 BF 730 MT 730 AK 730 PH 7C Code Y113480 7 ...
Страница 4: ...This page is intentionally left blank ...
Страница 10: ...This page is intentionally left blank ...
Страница 30: ...3NB 3ND 3N0 3NK 1 2 12 5 Remove tape from the bridge drive unit Figure 1 2 15 Tape Service Manual Y113480 7 ...
Страница 32: ...3NB 3ND 3N0 3NK 1 2 14 3 Remove tape and pad Figure 1 2 18 Tape Pad Service Manual Y113480 7 ...
Страница 34: ...3NB 3ND 3N0 3NK 1 2 16 This page is intentionally left blank Service Manual Y113480 7 ...
Страница 53: ...3NB 3ND 3N0 3NK 1 3 19 This page is intentionally left blank Y113480 7 Sevice Manual ...
Страница 87: ...3NB 3ND 3N0 3NK 1 4 34 This page is intentionally left blank Y113480 7 Sevice Manual ...
Страница 93: ...3NB 3ND 3N0 3NK 1 5 6 This page is intentionally left blank Y113480 7 Sevice Manual ...
Страница 127: ...3NB 3ND 3N0 3NK 2 2 10 This page is intentionally left blank Y113480 7 Sevice Manual ...
Страница 149: ...3NB 3ND 3N0 3NK 2 3 22 This page is intentionally left blank Y113480 7 Sevice Manual ...