Technical Data drawing).
2. Drill two holes in the wall,
1. Mark fixing screw bolt hole position on finished wall at the required height (refer
220mm apart. For masonry walls, using a 14mm masonry
drill bit, to a depth of 75mm.
N.B – The supplied fixings are suitable for masonry walls only.
for ease of assembly.
4. Screw bolts into stud wall using a 8mm spanner until screw thread is in line with the
finished wall.
5. Slide basin onto the protruding fixing bolts, and insert plastic bushes so the bush is
separating the metal bolt from the basin surface.
6. Fit metal washers and fasten with supplied hex nuts using a 17mm spanner.
N.B – DO NOT OVER TIGHTEN HEX NUTS as this may cause the basin to crack.
7. Connect Basin to drainage system as per Australian standards and local authority
requirements.
8. Connect tapware to mains water supply.
DU7130
D
-
N
Installation Instructions
THIS BASIN MUST BE INSTALLED
IN ACCORDANCE WITH
AS/NZ 3500.2 AND LOCAL REGULATIONS. THIS BASIN MUST
BE INSTALLED
BY A LICENSED PLUMBER
.
2022-11/Version 1.0
Before you begin
Check the product for damage, if the product is damaged return to
the
store of purchase.
Check the product is complete with all components required to install.
This product is to
only be installed by a licensed plumber,
and must be installed in accordance with these
instructions,
failing to do so will void warranty.
Installation Instructions
Installation
i
nstructions
IMPORTANT:
Provide suitable reinforcement behind finished wall for the basin fixing at the
fixing height position.
3. Prior to fitting the basin it is recommended the waste is assembled to the basin