Oliver IGD TOCSIN 102 SERIES Скачать руководство пользователя страница 8

Setting Instantaneous Zero

Press and hold the UP button 
until the I  ZERO LED is 
illuminated. Release the button 
and the LED will flash.

OPTION 3 I ZERO (INSTANTANEOUS ZERO) 

OLIVER

IGD

TOCSIN 106P

U N I V E R S A L  P E L L I S T O R 
D R I V E  P C B
A N A L O G U E  O R 
A D D R E S S A B L E  O U T P U T

mA+

360

0V

mA-

Set Address

4101

DOWN

GND

A

B

+24V

CHASS

W

Y

P

P

ALM

I CAL

CAL

I ZERO

360mA

mA

T106P V2

F

AUL

T

UP

ZERO

Setting Instantaneous Cal

Press and hold the UP button 
until the I  CAL LED is 
illuminated. Release the button 
and the LED will flash.

OPTION 4 I CAL (INSTANTANEOUS CAL) 

mA+

360

0V

mA-

Set Address

4101

DOWN

GND

A

B

+24V

CHASS

W

Y

P

P

ALM

I CAL

CAL

I ZERO

360mA

mA

T106P V2

F

AUL

T

UP

ZERO

Ensure zero gas has been flowing passed head for enough time for the reading to stabilise (minimum of 60 
seconds). Press and hold either button until LED goes off, then release. 
LED's will then flash in turn for 5 seconds during zero. The unit will then automatically return to normal 
operation. 

Notes:1. The internal zero pot is also adjusted, this is needed if a new pellistor is fitted.
           2.The cal needs to be re-checked (due to possible changes in zero pot.)

Ensure cal gas has been flowing passed head for enough time for the reading to stabilise (minimum of 60 
seconds). Press and hold either button until LED goes off, then release. 
LED's will then flash in turn for 5 seconds during zero. The unit will then automatically return to normal 
operation. 

Notes: 1. The calibration gas used has to be the same as the last calibration.
 

2.The internal gain pot is also adjusted, this is needed if a new pellistor is fitted.

 

3.The zero needs to be re-checked (due to possible changes in gain pot.)

Page 8 of 9

These two options relate to early versions pre 2015

Содержание TOCSIN 102 SERIES

Страница 1: ...ationalgasdetectors com www internationalgasdetectors com IGD OLIVER Triton House Crosby St SK2 6TS England Oliver IGD Limited Ref T102P VERSION 6 00 TOCSIN 102 103 TOC 30 SERIES PELLISTOR OPERATION M...

Страница 2: ...of how well the system is installed and calibrated Oliver IGD Limited can help advise on the correct siting and calibration of gas detectors Mounting And Cable Information 145 0 126 0 128 5 COVER SEC...

Страница 3: ...glands and blanking plugs should have O Ring seals or sealing washers to maintain IP66 rating use Atex rated glands and blanking plugs Taper glands and blanking plugs should use suitable thread seala...

Страница 4: ...cal applications would be boiler rooms school laboratories commercial kitchens etc Cabling should have a suitable level of protection for the area into which the detector is fitted and be of a screene...

Страница 5: ...is designed to take input from a standard pellistor and give either a linear 4 20mA current source output or digital RS485 addressable output Status LED s are provided to indicate mode of operation a...

Страница 6: ...rrent Note the meter will read half the head drive current Use the UP DOWN buttons to increase or decrease the set point Fault LED flashes on every button press For MK3 and MK5 IGD pellistors set to 1...

Страница 7: ...h the LED flashing connect a multimeter as indicated to read the CAL mA output Use the UP DOWN buttons to increase or decrease the set point Note that 12mA mid scale or 50 LEL is indicated on the mete...

Страница 8: ...ading to stabilise minimum of 60 seconds Press and hold either button until LED goes off then release LED s will then flash in turn for 5 seconds during zero The unit will then automatically return to...

Страница 9: ...possible to set other address combinations by connecting the unit to an IGD configuration terminal This should only be undertaken by trained technicians and is beyond the scope of this manual OLIVER I...

Отзывы: