manualshive.com logo in svg
background image

923424003_09_004

923424003_09_004

923424003_09_004

Installation Methods

Installation Instructions

1

2

3

3

5

4

INSTALLATION

To install the luminaire follow the installation procedure as described bellow.

ΑΤΤΕΝΤΙΟΝ!!!

1.  Operations  for  installation,  maintainance  or  testing  must  be  done  by 
authorized  personel,  only  when  the  device  is  disconnected  from  the  mains 
power supply.

These  luminaires  are  used  in  places  where  emergency  luminaires  (CBS)  are 
needed.
Each luminaire must be permanently connected to mains power supply.

2. The device must be connected to the mains power supply through a fuse 
dependent by the total amount of the line’s  power load.

N

 for neutral, 

L

 for live and       for 

ground.

Package Contents

General

The luminaire can be installed in 2 different ways. It can be installed either at 
the ceiling or hanging with eye bolts. All mounting accessories are including in 
the package.

A

Ceiling

mounting

B

Hanging installation

with hooks

Ceiling Mounting

1

2

Mind  the  orientation  of  placement

!! 

The  top  cover  placement  is  achieved 
according  to  the  bottom  part  of  the 
luminaire  and  the  already  installed 
pictograms.

Changing Pictograms

1

2

P l a c e   t h e   a p p r o p r i a t e  
pictograms according to the 
position  of  the  luminaire. 
Firstly, remove the retaining 
plastic clip.

Install the pictogram and make 
sure it goes all the way down.

Remove  the  protective  films 
from both sides of the acrylic 
plate  and  install  it  in  front  of 
the  pictogram.  Mind  the 
orientation of the acrylic plate.

Place  the  plastic  retaining 
clip,  press  until  you  hear  click 
sound. Follow the same steps 
for the remaining sides of the 
pictogram.

3

4

1
1

4
1

1

Luminaire (Housing)
Mounting accessories

Manual

Set of 5 pictograms (U, D, R, L, B)
Acrylic Plates

Отзывы: