background image

Page 4 

www.oldschoolmodels.com 

Construction Manual

British 

Sunday Fighter

Bristol Spadport

Top Step 4 - Wing Assembly (R9 & SW4)

Locate one R9 from BP3 and 

one SW4 from BP9.

We find it easiest to glue 

SW4 to R9 first with a touch 

of thin CA; making sure it’s at 

90° and it’s tab fully inserted 

into the pre-cut slot in the 

rib. Then glue R9 in place on over the plans as shown, making sure 

the rib is completely pushed down, onto the spar.

SW4 is the same height as R9 so when it is resting on the building 

surface it should be holding R9 perfectly vertical.

Step 5 - Top Wing Assembly (R9 & SW4)

Locate an other R9 from BP3 

and another SW4 from BP9.

Using the same technique 

as before, glue these two 

pieces together, then in 

place.

For this step, and each of 

the following steps that involve attaching ribs and sheer webs, 

take the extra time to make sure that tab(s) from the already 

installed sheer web are completely inserted into the rib you’re 

about to glue in place. Any gaps will cause alignment errors as 

you go further into the wing’s build, and several of these gaps can 

lead to a longer than wing than designed.

Step 6 - Top Wing Assembly (R11 & SW4)

Locate one R11 from BP3 

and one SW4 from BP9.

These are glued in place as 

shown, making sure all the 

tabs are completely inserted 

into the slots.

Step 7 - Top Wing Assembly (R9 & SW4)

Locate three more R9’s from 

BP3 and three SW4’s from BP9.

Using the same technique as 

before, glue these pieces in 

place as shown.

Step 8 - Top Wing Assembly (R7 & SW3)

Locate one R7 from BP3 and 

two SW3’s from BP9.

This time two sheer webs are 

glued to R7, then glued to the 

rib as shown here.

Again, make sure the sheer 

web’s tabs are completely 

inserted into the slots.

Let’s begin construction by working on the Sunday Flyer’s 

top, port (left) wing. 

Step 1 - Alignment triangles

Pre-cut into LP3 is a triangle that can be 

used to vertically align any of the parts in 

the construction of your Sunday Fighter. 

LP3 also includes a foot piece that can be 

used with the triangle to hold it vertically, 

hands-free.

We recommend using this triangle throughout the wing 

construction, and in the alignment of the vertical fin.

Step 2 - Prepare your work area

You’ll need a flat building surface that is a minimum of 26” long. 

Position the top, port wing plan over the surface and tape into 

position. Tear off a length of waxed paper long enough to cover 

the plan and tape that into position, over the plan. 

Step 3 - Top Wing Assembly (lower spar)

Locate one of the 3/16” x 3/16” x 

24” basswood strips. This will form 

the lower spar. Position it over the 

plan, measure and cut to length, 

leaving about a 1/4” extra on each 

end. We prefer to tack-glue this 

piece to the waxed paper, holding 

it in place using a few small drops of medium CA, instead of t-pins. 

Be sure it is aligned properly and is straight over it’s entire length. 

The alignment of this spar is critical as the rest of the wing panel is 

based off this piece.

Cut into BP9 are SPC pieces. Use 

two of these as shown here, to raise 

the spar off the board, 

ONLY

 where 

the spar intersects R3 and R1.

Online Supplementary Photos

We realize that the smaller black-and-

white photos in this manual might not 

show some of the steps as clearly as 

you might want. So we’ve anticipated 

this and made these photos available 

on our website. You can either scan the 

QR code or type this address into your 

browser:

www.oldschoolmodels.com/mpics/sfb/

IMPORTANT!!!!!

THERE ARE SEVERAL STEPS THROUGHOUT 

THE BUILD OF YOUR SUNDAY FIGHTER WHERE 

PIECES NEED TO BE CUT FROM LEFT-OVER 

(SCRAP) WOOD.

AS YOU TRIM THE SHEETS/STICKS INCLUDED 

IN THIS KIT, PLEASE KEEP ALL SCRAP WOOD IN 

A SEPARATE PILE AS YOU’LL NEED SOME OF IT.

Содержание Bristol Spadport

Страница 1: ...out the building process You must correctly install all R C and other components so that the model operates correctly on the ground and in the air Installation shown in the manual is a suggestion You...

Страница 2: ...ser Cut 1 16 x 11 x 3 ply sheet 2 BP1 Laser Cut 1 8 x 4 x 24 balsa sheet 1 BP2 Laser Cut 1 8 x 4 x 24 balsa sheet 2 BP3 Laser Cut 3 32 x 4 x 24 balsa sheet 2 BP4 Laser Cut 3 32 x 4 x 24 balsa sheet 1...

Страница 3: ...with the fit then and only then glue the parts in position IT IS VERY IMPORTANT THAT YOU ASSEMBLE THIS KIT IN THE ORDER DESCRIBED SKIPPING FORWARD IN THE STEPS COULD LEAVE YOU WITHOUT THE PROPER LENGT...

Страница 4: ...g on the Sunday Flyer s top port left wing Step 1 Alignment triangles Pre cut into LP3 is a triangle that can be used to vertically align any of the parts in the construction of your Sunday Fighter LP...

Страница 5: ...e this in place making sure it is securely glued to the front of each rib and that each rib is properly aligned Using a long straight edge can help holding everything in place firmly against the build...

Страница 6: ...are uncut 1 16 balsa sheets and extra sheeting on the BP9 sheets These are used when sheeting the center section of the wings as well as a few points on the fuselage Carefully measure and cut a few pi...

Страница 7: ...d one steel strap Push the two dowels halfway into the holes in CM2 Now note the curvature of CM2 as the more curved surface will be oriented downward Carefully push the two dowels in the CM2 assembly...

Страница 8: ...hatch but don t glue it to the hatch Set the bottom wing half aside and begin work the opposite half of the bottom wing Follow steps 34 through 44 to complete the other wing half Once finished then m...

Страница 9: ...a good fit After test fitting join the top wing halves permanently with a bit more 30 minute epoxy Remove the dihedral brace and apply the epoxy into the pockets in each wing half and also coat the fa...

Страница 10: ...ngths first before reverting to longer uncut lengths Step 65 Rudder Assembly bottom corner Locate both VF4 s from BP1 Glue one on top of the other then to the leading edge paying close attention to it...

Страница 11: ...ace Step 77 Fuselage Assembly TR2 FS2 assemblies Now it time to take both sub assemblies and put them together as shown here Make sure all tabs are fully seated in their matching pre cut slots After t...

Страница 12: ...t in place with it s tabs inserted into the pre cut slots in the fuse sides Make sure that the shorter wide cutout and round holes are aligned towards the top of the fuselage Glue in place Step 88 Fus...

Страница 13: ...the stab and make sure that the fin is 90 to stab s surface Then glue this assembly to the fuselage Make sure that the stab is properly positioned pushed up against F8 and the long trailing edge of t...

Страница 14: ...rs in the hatch area Make sure they are pushed in so they are flush with the surfaces A touch of thin CA will help hold them in place And pay attention to their polarity so they attract not repel Step...

Страница 15: ...en cutout the opening or make the opening cuts first then install the pieces as we ve done here This is done in a similar manner to how you sheeted the top surfaces in previous steps one half at a tim...

Страница 16: ...r sand bevels into the leading edges and round their trailing edges Step 124 Fuselage Assembly wing alignment To align the lower wing properly on the fuselage place the lower wing in position by pushi...

Страница 17: ...back of each t nut to hold it in place Make sure not to get any glue into the threads Step 131 Tailwheel mounting Mount your choice of tailwheel to the bottom of the fuselage It should mount to the bo...

Страница 18: ...pre cut in the back of TR2 From scrap 1 8 lite ply cut four strips to double up the wood where the servo mounting screws will be install Servo mounting throttle glow engines If you are powering your...

Страница 19: ...ghters as they are using existing roundels assuming you want to use roundels Our prototypes use 5 1 4 diameter on the wings and 2 1 2 diameter for the fuselage Contact Callie Graphics at this link htt...

Страница 20: ...usted Check all the control horns servo horns and clevises to make sure they are secure and in good condition Replace any items that would be considered questionable Failure of any of these components...

Страница 21: ...Construction Manual www oldschoolmodels com Page 21 British Sunday Fighter Bristol Spadport Appendix A...

Страница 22: ...Page 22 www oldschoolmodels com Construction Manual British Sunday Fighter Bristol Spadport Appendix A...

Отзывы: