Old Hickory VPO-54 Скачать руководство пользователя страница 8

8 of  14

Operating Instructions

If gas odor is detected at any time, immediately shut off the top button on the oven and
shut off the gas supply valve to the oven. Do not permit any open flames in the area of the
oven.  

Immediately contact an authorized Service Agency or your local Gas Supply

Company.  

Initial heating of the oven must be done in a well-ventilated area as it may

generate smoke or fumes. Overexposure to smoke or fumes may cause nausea or dizzi-
ness.  Whenever lighting the oven, the ventilation system must be on.

1

Burner Lighting Procedure:

Your state of the art oven requires no pilot lighting.  The pizza oven’s computerized

system automatically controls ignition for the deck burners and the topping burners.  Burner
lighting instructions are provided under preheating.

2

Breaking in:

Since your oven has a steel deck, no breaking period is required.  If during installation, the

deck may has gotten scratched, you should follow “Deck Maintenance” procedures.

3

Pre-Heating:

Ensure oven has been connected to gas and plugged in according to the installation

instructions.

Ensure you are familiar with the front panel.

Emergency Stop

Display Touch Screen

Power Button

Emergency Stop - 

Turns off power to the entire oven.

Display Touch Screen -

 The interface between the operator and the computerized controls.  All

temperature adjustments, motor speed adjustments, cooking burner intensity adjustments are
entered with the display.

Power Button - 

Supplies the motor, lights and ignition systems with power.

Содержание VPO-54

Страница 1: ...2 Visual Pizza Oven Installation and Operating Instructions RETAIN THIS MANUAL FOR FUTURE REFERENCE Hickory Industries Inc 4900 Westside Avenue North Bergen NJ 07047 Tel 201 223 0050 Fax 201 223 0950...

Страница 2: ...a Natural gas or a Propane gas odor DON T panic DON T light a match candle or cigarette DON T turn electrical appliances or lights on or off For safety a shut off valve was installed on this applianc...

Страница 3: ...or death Read the Installation Operating and Maintenance Instructions thoroughly before installing or servicing this equipment Initial heating of oven may generate smoke or fumes and must be done in a...

Страница 4: ...en wired with a NEMA 5 15 cord and plug and should be plugged in to a corresponding NEMA 5 15 receptacle The grounding prong SHOULD NOT BE CUT Cutting the grounding prong will void the manufacturers w...

Страница 5: ...ng the crate s carton s is CONCEALED DAMAGE and the carrier must be notified immediately to send an inspector and also furnish the forms for the consignee s claim against the carrier When oven arrives...

Страница 6: ...re suppression will be required by code Local inspectors and ventilation specialists should be consulted to make sure that the installation of the hood conforms to the local codes and requirements 4 G...

Страница 7: ...as supply has been connected it is extremely important to check all the piping for leaks Use a soap and water solution or a product made expressly for this purpose Do not use matches candles or a flam...

Страница 8: ...omatically controls ignition for the deck burners and the topping burners Burner lighting instructions are provided under preheating 2 Breaking in Since your oven has a steel deck no breaking period i...

Страница 9: ...re or during your preheat Once you have begun cooking your products you will be more familiar with this screen and you will have to use this screen less because all your cooking data will be stored so...

Страница 10: ...p up like a calculator This is where you input your settings and hit enter Pressing home will toggle you to the HOME screen and you are ready to preheat your oven and then your ready to cook 4 Baking...

Страница 11: ...e cloth coat the deck lightly and press Start Cook for an hour or until you visually see the smoke clear Please ensure this is done with the ventilation system ON 3 Lights The oven uses 10 volt DC hal...

Страница 12: ...12 of 14 6 Parts Breakdown P001 P002 P003 P006 P0017 P018 P016 P007 P008 P009 P0011 P012 537...

Страница 13: ...13 of 14 Electrical Diagram...

Страница 14: ...on the regulator has to be set A manifold pressure of 5 5 water column for Natural Gas and 11 water column for LP gas The pressure check should be taken downstream of the pressure regulator with gas...

Отзывы: