
4
Figure 5 HCT-HV1 Hand-piece Assembly
4. Setup and unit operation
1. Basic unit setup
1.
Connect the hand-piece assembly, HCT-HV1, to the power supply.
2.
Plug the power cord into the power connector (Figure 2). Plug the power cord
into a grounded wall socket of the rated input line voltage.
3.
Connect the dual footswitch, HCT-FS2, to the unit (Figure 2).
4.
Turn On the unit by pressing the Power button
momentarily.
5.
To Abort a Profile (to the Cool-Down zone*) press and hold the
(red) on the
footswitch or
(red) on the hand-piece down while in Run Mode.
6.
*Note
: Depressing the
(red) on the footswitch or
(red) on the hand-piece
a second time will decrease the cool down time to a minimum of 60 seconds.
7.
Turn Off the unit by pressing the Power button
momentarily.
Note ~
you
must be out of set-up mode in order to do this. I.e. no flashing numbers on the
display.
2. System Mode Selection
The HCT-1000 has two system modes of operation.
•
The first mode is
HCT
. In this mode, the HCT-1000 is used as a standalone
handheld convection rework tool.
•
The second mode is
MRS.
In this mode, the HCT-1000 is used as part of a
M
odular
R
ework
S
ystem. The unit is connected via cable to a PCT-1000 and
may be used with the ATH-1000 Adjustable Tool Holder. In this mode the
HCT-1000 provides timing control for both units and the ATH-1000 allows
repeatable place and remove operations.
•
Plug the Communications Cable into the Communication Connector (Figure 2
above) on the HCT-1000 and the PCT-1000. When connected in MRS mode
the time setting on the PCT-1000 will display “- -“.
Vacuum Pick-up Tube
(red) Profile Start/Abort
(blue) Vacuum Activation
Vacuum Pick-up Tube
Adjustment
Heater Assembly
Figure 6 HCTA-TH1
Figure 7