![OHAUS MB23 Скачать руководство пользователя страница 4](http://html1.mh-extra.com/html/ohaus/mb23/mb23_user-manual_3597433004.webp)
EN-2
MB23 / MB25
Application Disclaimer
Moisture determination applications must be optimized and validated by the user according to local regulations. Application
specific data provided by OHAUS is for reference purposes only. OHAUS waives all liability for applications based on this
data.
2. INSTALLATION
2.1
Selecting the location
The location must be sturdy, flat and level. Avoid locations with excessive air current, vibrations, heat sources or rapid
temperature changes. Allow sufficient space around the instrument.
Select a location that is safe and with adequate ventilation. Fire, corrosive or toxic fumes and other hazards associated with
the test samples will require specially prepared locations.
2.3
Installing Components
(1) Install and position Draft Shield
(2) Install Pan Support, turn it until it
engages into position
Optional Sample Pan Handler
– Slide
an empty sample pan under the pan
handler, then place over the pan
support
2.3 Connecting Power
Connect the AC mains power cord to the instrument's power input connector, and then connect the AC plug to a suitable
electrical outlet.
See also section 1, Safety Precautions
After connecting the Analyzer to the AC supply (standby mode), allow the Analyzer to warm up for at least 15 minutes for best
results.
Power: On
(short press) /
Off / Standby Mode
(long press)
When powered on from standby mode, the Analyzer is ready for immediate use.
2.4 Initial Calibration
For best results, the instrument's calibration should be checked prior to first use. If adjustment is needed, refer to the
Calibration section of the instruction manual.
Содержание MB23
Страница 1: ...MB23 MB25 MB27 Moisture Analyzer User Guide EN PT SV DA PL NL CZ HU...
Страница 2: ...EN 2 MB23 MB25...