Page 7 of 7
Riff Tables by OFS | Assembly Instructions
Riff-Nic, Bar Height and Tennis Table Assembly Instructions
STEP 4
1. Turn Base over and place in desired location.
2. Make Base level by adjusting Levelers.
3. Place Worksurface on Base and position so it is centered
both directions.
Center
on
base
Center
on
base
Secure Work surface to base by
•
screwing #8 x 5/8" pan head screws
(HK-105) through the L-Brackets.
Use #8 x 1 1/4" pan head screws
•
(HK-104) to secure cleats to work surface.
Use #8 x 2 1/2" pan head screws (HK-101)
•
to secure bases to work surface.
Cleat
L-Bracket
#8 x 5/8"
#8 x 2 1/2"
#8 x 1 1/4"
Turn base over and place in desired location.
•
Make base level by adjusting levelers.
•
Place work surface on base and position so it is centered both directions.
•
Riff Table
Assembly Instructions
Page 4
Series:
Part #:
Verve X1
Center
on base
Center
on base
L-Bracket
Cleat
4. Secure Worksurface to Base by screwing
#8 x
5/8
” Pan Head Screws (HK-105) through
the L-Brackets.
5. Use #8 x1 ¼” Pan Head Screws (HK-104)
to secure Cleats to Worksurface.
6. Use #8 x 2 ½” Pan Head Screws (HK-101)
to secure Bases to Worksurface.
#8 x 1 ¼"
#8 x 2 ½"
#8 x
5/8
"