![OfiTE 170-182-1 Скачать руководство пользователя страница 22](http://html1.mh-extra.com/html/ofite/170-182-1/170-182-1_instruction-manual_3476359022.webp)
OFITE, 11302 Steeplecrest Dr., Houston, TX 77065 USA / Tel: 832-320-7300 / Fax: 713-880-9886 / www.ofite.com
21
Cell Cap
Assembly
1. Choose the appropriate cap for your test:
- 171-190-032-S - Outlet, for Cement
- 171-190-033-S - Inlet, for Cement
2. Place the locking ring (#171-190-023) around the cap.
3. Place the retaining ring (#130-81-040) into the groove around the outside
of the cap. Make sure it engages completely around the circle.
The cap should turn freely inside the locking ring.
4. Place an o-ring in the port in the cap. Wrap a rupture disk (#171-190-027)
with nickel anti-seize tape (#171-190-040) and screw it into the port.
Rupture Disk
(#171-190-027)
Retaining Ring
(#130-81-040)
Cap
Locking Ring
(#171-190-023)
Rupture Disk
O-ring
Cap
Retaining Ring
Locking Ring