OFITE, 11302 Steeplecrest Dr., Houston, TX 77065 USA / Tel: 832-320-7300 / Fax: 713-880-9886 / www.ofite.com
6
Loading the
Test Cells
1. Prepare the cement slurry and pour it into the slurry container as specified
in API Specification 10.
2. Insert the paddle into the test cell. Make sure the point on the end of the
paddle is inserted into the hole in the bottom of the test cell.
3. Place the lid on the test cell by sliding the torque shaft over the end of the
paddle. Turn the lid clockwise until the pin in the torque shaft engages
with the slot in the paddle shaft.
4. Continue turning the lid to lock it in place on top of the test cell.
5. Lower the test cell into the bath and lock it in place with the locking pins.
Torque Shaft
Locking Pin
Locking Pin
Locking Pin