12
1.
Perform roll check and leak check prior to disassembling the unit.
2.
Remove the magnetic Pipe Plug (20) from Input Cover (17) and drain the oil out of the
gearbox.
NOTE:
Record the condition and volume of the oil.
3.
Remove four of Shoulder Bolts (18) followed by sixteen of Hexagonal Bolts (15) from Cover
Subassembly.
4.
Lift the Cover Subassembly off of the unit.
NOTE:
For 29 and 40 to 1 ratios only.
5.
Remove Sun Gear (27) from Input Carrier Subassembly.
6.
Remove Input Carrier Subassembly off of the unit.
NOTE:
Figure 1 refers to 29 and 40 : 1 Ratios
Continued on Next Page
Содержание S16A2
Страница 1: ...1 Torque Hub Planetary Final Drive S16A1 2 Series Service Manual Rev 9 3 13...
Страница 10: ...10 DISASSEMBLY...
Страница 22: ...22 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 23: ...23 ASSEMBLY...
Страница 36: ...36 Planetary Final Drive Service Manual Assembly Drawing...
Страница 39: ...39 Planetary Final Drive Repair Instructions Assembly Tools T158150 LOADING PLUG AND BASE FOR ASSEMBLY...
Страница 40: ...40 T158149 LOADING PLUG AND BASE...
Страница 41: ...41 T160764 BEARING CUP ASSEMBLY PRESSING TOOL...
Страница 42: ...42 T223131 LOCKNUT WRENCH...
Страница 43: ...43 T119240 LOCKNUT WRENCH...
Страница 44: ...44 T154563 ASSEMBLY PRESSING TOOL...
Страница 45: ...45 T139345 ASSEMBLY PRESSING TOOL...
Страница 46: ...46 T137786 TOOL TO PRESS IN SEAL...
Страница 47: ...47 T158049 BEARING CONE PRESSING TOOL...
Страница 48: ...48 T136184 TOOL TO PRESS BEARING ON SHAFT...
Страница 49: ...49 T159173 PRESSING TOOL TO INSTALL BEARING CONE...
Страница 50: ...50 T173814 LEAK TEST FIXTURE...
Страница 51: ...51 T220225 LEAK TEST TOOL...
Страница 52: ...52 T224477 ROLL TEST TOOL...
Страница 53: ...53 T223989 ROLL TEST TOOL...
Страница 54: ...54 T158149 LOADING PLUG AND BASE FOR ASSEMBLY...
Страница 56: ...56 Oerlikon Fairfield U S 52 South P O Box 7940 Lafayette IN 47903 USA 765 772 4000 www oerlikon com fairfield...