2.4
Connecting the Temperature Resistant
Gauge Head Cable
Switch the IONIVAC off first before working at the
gauge cable. After switching off, wait for at least 15
seconds.
Disassembling the gauge head for connecting the
temperature resistant gauge head cable
Remove the plug guide (2/4) by unscrewing the cylinder
head screws (2/5 and 2/6) from the gauge head (2/1).
The gauge head IE 514 has been designed in accordance
with the VDE regulations with a greater distance between
gauge head flange (2/1) and plug guide (2/4).
For this reason three spacers have been fitted between
gauge head flange (2/1) and the plug guide (2/4).
Positioning of the plug guide is defined through the different
bolt diameters on the gauge head (2/1).
Notice: the temperature resistant gauge head cable may
also be connected after the gauge head has already been
installed.
Connecting the temperature resistant gauge head
cable to the flange on the gauge head
n
Via the high-temperature cable pull the housing (2/13)
over the connection plugs so that these may thereafter
be screwed back onto the gauge head flange (2/1).
Installation
10
300265097_002_A1 - 05/2014 - © Oerlikon Leybold Vacuum
CAUTION