13 Chronology of Different Measuring Processes
46 / 84
Instruction Manual Myopia Master® (G/68100/EN Rev08)
13
Chronology of Different Measuring Processes
The chronology of three different measuring processes is outlined briefly
below.
1
You enter a patient in the patient data management and then
conduct the measurement.
The examination data are automatically saved under the newly
entered patient’s name
.
2
You start directly with the measuring operation and then
subsequently save the examination under an existing patient’s
name. Alternatively, you can also enter a new patient after
performing the measuring operation
.
3
You perform a measuring operation without saving the examination
under a patient’s name
.
13.1
Enter P Measure
Press the button [Patient] in the patient data management.
Create a new patient, as described in
.
The newly entered patient appears in the list of patients and is
highlighted in blue.
Start the measuring operation by pressing the [Measure] button.
Press the optional joystick button.
Conduct the measurement
.
When the measuring operation has been completed, the overview
screen appears
.
The conducted examinations are automatically saved in the patient
data management.
The saved examinations can be viewed again at any time
.