Ocean Sonics BP2-B1 Скачать руководство пользователя страница 11

 

 

                                                       Battery Pack User Guide                         March 2020             P.10 

Appendix B 

Webserver 

1.

 

Open 

Marco 

 

2.

 

Double click on hydrophone serial number to open webpage 

3.

 

Go to Data 

 Retrieve Page  

4.

 

Ensure all previously recorded data is deleted from the hydrophone so the maximum 
amount of data can be recorded during the deployment  

5.

 

Under 

Operations 

 Set Time

 from computer 

if hydrophone is not showing correct date/time set using the computer   

6.

 

Under 

Settings Tab 

 Data Collection

  

7.

 

Choose appropriate settings 

a)

 

WAV Sampling 

b)

 

Spectrum FFT Sampling 

c)

 

Duty Cycling / Enable Delay if applicable  

8.

 

Click 

Apply

 and wait for page to load completely  

9.

 

Verify settings and that all changes performed on webserver have remained 

10.

 

Disconnect unit and connect to Battery Pack 

 

Lucy 

1.

 

Connect to icListen on Lucy 

2.

 

Ensure all previous data has been deleted from hydrophone so maximum amount of 
data will be recorded  

3.

 

Click on 

icListen icon

 (clipboard) at the bottom right of Lucy display (

Setup

).  

4.

 

Under 

Link Setup 

click on Instrument Time (UTC) 

Set Using PC.

 

5.

 

Under 

icListen HF Setup

 tab 

-

 

Setup sampling for WAV and FFT data 

-

 

Click 

Apply

 

6.

 

Disconnect hydrophone from test cable and connect to Battery Pack  

 

Содержание BP2-B1

Страница 1: ...FOR MODELS BP2 B1 BP2 B3 BP9 B3 BP35 B3 BBPBP35 B3 Battery Pack User Guide March 2020 Version 2 1...

Страница 2: ...ng Voltages 6 Deployment 6 Recovery of the Battery Pack 7 Maintenance 7 Anodes 8 Cleaning the Seal 8 Appendix A 9 O RING REPLACEMENT INSTRUCTIONS 9 Appendix B 10 Webserver 10 Lucy 10 Revision History...

Страница 3: ...y Pack can power hydrophones Number of Channels Alkaline Lithium 1 30 90 2 15 42 3 10 26 4 7 5 19 The B3 model of Ocean Sonics Battery Packs can be easily configured for the use with alkaline or lithi...

Страница 4: ...ter or dirt enters the interior 4 Remove the inner assembly from the pressure housing Installing New Batteries 5 Loosen the 3 thumb screws on the contact plate A until it can be lifted from the assemb...

Страница 5: ...g each individually Or pushing the batteries down from the top without taking out foam 10 Replace the contact plate A 11 Hand tighten thumb screws into place as seen on right This should be done with...

Страница 6: ...into place with ease 16 Confirm if your model has a vent plug or pressure relief valve and follow the appropriate steps below IF MODEL HAS A VENT PLUG a Close the vent plug for deployment Ensure the...

Страница 7: ...atteries should measure approximately 27 29 VDC Fresh Lithium batteries should measure approximately 21 25 VDC Deployment The battery pack is now ready to provide power to your hydrophone s for your d...

Страница 8: ...sing 2 Rinse Battery Pack with fresh water to clean 3 Before opening follow ALL Maintenance procedures Maintenance The outside of the battery pack should be thoroughly rinsed with fresh water after ea...

Страница 9: ...ployed on a long deployment it is recommended that you have fresh anodes The consumption rate of the anodes depends on many factors salinity temperature water currents electrical leakage etc After eac...

Страница 10: ...SOPROPYL ALCOHOL 3 INSPECT GROOVES FOR DAMAGE SCRATCHES AND DEBRIS 4 CAREFULLY CLEAN AND INSPECT NEW O RINGS AND BACKUP RINGS PRIOR TO INSTALLATION 5 APPLY MOLYKOTE 44 O RING LUBRICANT OR EQUIVALENT T...

Страница 11: ...a WAV Sampling b Spectrum FFT Sampling c Duty Cycling Enable Delay if applicable 8 Click Apply and wait for page to load completely 9 Verify settings and that all changes performed on webserver have r...

Отзывы: