![Ocean Signal E101V Скачать руководство пользователя страница 8](http://html1.mh-extra.com/html/ocean-signal/e101v/e101v_user-manual_3229108008.webp)
E101V USER MANUAL
8
Part No 912S-01865
•
Pass the cable from the ship’s network through the gland of the mating half and
connect to the RJ45 connector as shown for POE or ship’s supply options.
•
Connect the two cables through the joiner and mate the waterproof cable housing
together.
2.1.2
Ships Supply Connection
When connecting the E100V to the Ships supply, the included junction box must be
used. This is fitted close to the VDR network switch and connected as shown in the
diagram below, noting the polarity of the supply connections.
2.2
EPIRB Installation
•
Take the HRU and locate the two retaining ridges at the bottom of the HRU onto the
spring. Carefully push the HRU against the spring
•
Push the HRU into position as shown. Push the locking pin with the retaining flange
pointing down.
•
Pull the HRU up and load the EPIRB into the housing, ensuring it locates into the
upstand in the base. Gently release the HRU to lock the EPIRB in place.
•
Plug the network cable from the E100V into the socket in the base, being careful to line
the pins up correctly before pressing home.
•
Replace the housing cover, making sure the cable and antenna are neatly stowed.
Rotate the locking knob clockwise and insert the R-clip to lock it in place.
+V
0V
From VDR
To E101V
To Ships Supply
Содержание E101V
Страница 19: ...E101V USER MANUAL 19 Version 00 30 7 4 2016...
Страница 20: ......