Océ ProCut Site Preparation Guide - Revision:  E 

 

 

       17 

Océ ProCut Windows Server & ONYX RIP

 

 

It is recommended that the Océ ProCut Windows Server and ONYX RIP run on the same 
computer. Running the two applications on the same computer will provide the fastest file 
handling since all data files are local. 

• 

Intel Pentium IV or higher / Xeon 3+ GHz/Core2 Duo 2GHz processor or faster or 
Athlon 64 / Opteron 2+ GHz  

• 

Dual CPU {For Optimum Multiple RIP Performance}  

• 

Two Hard Drives – One 80 GB Drive for OS and Applications, one 200+ GB for 
data  

• 

2 GB RAM per CPU  

• 

1280 x 1024 16-bit Color Minimum  

• 

2x available USB Ports (for ONYX and Océ ProCut Server security keys/dongles)  

• 

DVD-ROM Drive  

• 

TCP/IP network connection (100Mbit or faster) 

• 

Windows Vista or Windows XP Pro with the latest service pack  

 

Windows ProCut Vision 

• 

Intel Pentium 3 GHz / Core2 Duo 2 GHz processor or faster 

• 

2 GB RAM or more 

• 

20 GB available hard disk space or more 

• 

CD / DVD drive 

• 

TCP/IP network connection (100Mbit or faster) 

• 

2 x available USB port security key/dongle and barcode reader) 

• 

1 x available PCI slot (video frame grabber card) NOTE: The PCI card is a half-
length card, but full height (there are also half height cards) 

• 

1 x available RS232 com port / USB to RS232 converter (Zünd Cutter) 

• 

Screen resolution 1280x1024 (minimum) 

• 

17” or larger Flat Panel Display  (TFT screen) 

• 

Windows XP or Vista 

 

 

 

Содержание ProCut 1600 M

Страница 1: ...Oc ProCut 1600 2500 and 3200 Series Cutters Revision E July 23 2010...

Страница 2: ...Oc ProCut Site Prep Oc ProCut Site Preparation Guide Revision E ii Oc Display Graphics Systems 2010 All Rights Reserved Part Number 3010108370...

Страница 3: ...Floor Loading 5 Electrical Placement 5 Location Dimensions 5 Electrical Requirements 6 400V Electrical connection 6 200V Electrical connection 7 Ground Fault Requirements 8 Router Vacuum Cleaner 9 Du...

Страница 4: ...rical Connections with 2 2 2 55kW Vacuum Pumps 8 Table 9 Electrical Connections with 2 2 2 55kW Vacuum Pumps 8 Table 10 Vacuum Cleaner Specifications 9 Table 11 Compressed Air 10 Table 12 1600 Series...

Страница 5: ...vision Summary Oct 27 2008 Revision A Initial release Dec 15 2008 Revision B Added harmonics and flicker info Mar 12 2009 Revision C Added 1600 series and 3200 XXL and XXXL models Jul 29 2009 Revision...

Страница 6: ...the cutter to the installation location If necessary arrange for a forklift or mobile crane to be available on the installation day Examine the route to the desired location of the Cutter The followin...

Страница 7: ...shipping crates Important The majority of the installation will be carried out by a Oc trained Service Technician However additional support is required for some tasks transportation moving heavy part...

Страница 8: ...mensions mm In Crate kg Crate 1 Basic unit 3550 x 1580 x 700 720 Crate 2 Basic unit 3160 x 1580 x 940 1030 Largest part unpackaged 3412 x 300 x 300 115 2500 M Crate Dimensions mm In Crate kg Crate 1 B...

Страница 9: ...with a vacuum cleaner will ship with the workstation inside a crate Cutter Extension Option Crate Dimensions and Weight Cutter Extension CE2500 Crate Dimensions mm Weight kg 2500 L 2690 x 890 x 560 19...

Страница 10: ...face is recommended The difference in height over the entire installation surface must be less than 2 cm The subsurface for the machine must be sufficiently level and stable The floor in the operation...

Страница 11: ...s used it must be a meet particular specifications see Ground Fault Requirements for more details Electrical connection 400 V system with 1 9kW Vacuum Generator The cutter is connected with one power...

Страница 12: ...y voltage variance max 10 Power consumption 3 phases max 12 6kW typical 5 6kW Table 6 Power Consumption and Variance Figure 3 200V Electrical Connection A Cutter Power box Value Unit Phases 3 Voltage...

Страница 13: ...L1 L2 L3 N PE CEE Plug 32A Table 8 Electrical Connections with 2 2 2 55kW Vacuum Pumps Electrical connections 208 V system with 2 2 2 55 kW vacuum pump 1600 M Only Comply with national instructions an...

Страница 14: ...r CDH440C or similar In a 200V electrical configuration with the milling router option there are two connections to power supply system and if an RFI is required both connections should have an RFI th...

Страница 15: ...lass ISO 8573 1 4 Pressure Air flow Air pressure 0 8 1 0 mPa 116 145 Psi Air flow minimum 300 L min 79 Gal min Basic unit 0 6 1 0 mPa 87 145 Psi 19 L min 5 Gal min Pneumatic Oscillating Tool 0 8 1 0 m...

Страница 16: ...and knowledge of PC operation Only specially trained personnel must operate the Cutter Trainees must have prior knowledge of computers and basic mechanical abilities Trainees must be available during...

Страница 17: ...s mm Weight kg Basic unit L x B 2512 x 2055 670 Operator console B1 300 Work Station B2 624 Router Option B3 330 1600 XL Dimensions mm Weight kg Basic unit L x B 2512 x 2995 890 Operator console B1 30...

Страница 18: ...rator console B1 300 Work Station B2 624 60 Router Option B3 330 2500 M Dimensions mm Weight kg Basic unit L x B 3412 x 2055 840 Operator console B1 300 Work Station B2 624 60 2500 L Dimensions mm Wei...

Страница 19: ...x 2995 1280 Operator console B1 300 Work Station B2 624 60 3200 XXL Dimensions mm Weight kg Basic unit L x B 4112 x 3465 1420 Operator console B1 300 Work Station B2 624 60 3200 XXXL Dimensions mm Wei...

Страница 20: ...1519 105 Cutter Extension CE3200 T1 mm T2 mm Weight kg 3200 L 3145 1989 170 3200 XL 3145 2459 180 3200 2XL 3145 2929 230 3200 3XL 3145 3399 260 Table 15 Cutter Extension Dimensions and Weights Floor C...

Страница 21: ...ms Safety Information Ear and eye protection required Minimum PC Requirements Please check the www dgs oce com web site for the latest PC specifications Oc ProCut Macintosh Prepress Client Intel MAC G...

Страница 22: ...bit Color Minimum 2x available USB Ports for ONYX and Oc ProCut Server security keys dongles DVD ROM Drive TCP IP network connection 100Mbit or faster Windows Vista or Windows XP Pro with the latest s...

Страница 23: ...rarily then a suitable place is available The size and weight of the machine have been taken into account and the floor is suitable for the cutter The power main connection is ready The power main sup...

Отзывы: