![OBO Bettermann isCon 750 LGR Скачать руководство пользователя страница 40](http://html1.mh-extra.com/html/obo-bettermann/iscon-750-lgr/iscon-750-lgr_system-instructions_722015040.webp)
OBO BETTERMANN
40 | EN
Installing the isCon system
Preparing the isCon cable
• When using the isCon cable isCon 750 LGR:
Using a cable knife, remove the grey cable jacketing to a length of 50
mm (see also „5.1 Cutting and removing the insulation of the isCon
cable“ on page 29).
• Mount the connection element (Figure 40 No.
3
) on the isCon cable
as described in sections „5.1.2 Revealing the copper core for connec-
tion“ on page 30 and „5.2 Mounting the isCon connect connection
element“ on page 31.
Only for the light grey cable isCon 750 LGR:
To connect the potential connection element, the light grey jacket in the
contact area must be removed.
ATTENTION
Risk of damage!
The black, weakly-conductive jacket may not be removed, as otherwise
the connection to the building's equipotential bonding can be interrupted.
In the case of the grey cable jacket, maintain a maximum cutting depth of
1.5 mm.
• Measure 1500 mm from the bottom edge of the isCon connect con-
nection element.
• Remove 50 mm of the grey cable jacket with a cable knife.
isCon 7
50 L
GR
50 mm
50 mm
1500 mm
> 1,5 mm
1,5 mm
Figure 41:
Removing the light grey outer jacket
Содержание isCon 750 LGR
Страница 1: ...03 2014 EN isCon System instructions...
Страница 65: ...System instructions OBO isCon EN 65 Own notes...
Страница 66: ...OBO BETTERMANN 66 EN...
Страница 67: ......