![OBO Bettermann EUK Скачать руководство пользователя страница 47](http://html1.mh-extra.com/html/obo-bettermann/euk/euk_system-instructions_3161374047.webp)
47 | EN
EÜK screed-covered duct system
Preparations for mounting
2. Mark the planned cable routes and intersection points of the
underfloor junction boxes/underfloor device sockets
1
using
a suitable tool (e.g. laser measurement device or chalk line) on
the floor.
Fig. 6:
Aligning the underfloor junction boxes/underfloor device sockets
3. Align the underfloor junction box/underfloor device socket
1
on the intersection points.
4. Determine the length of the necessary underfloor installation
ducts
2
.
Содержание EUK
Страница 4: ......
Страница 70: ...70 EN OBO Bettermann Technical data...