background image

We reserve the right to modify product specifications without prior notice.

 

CV300

-

INS

-

04 2822© Oasis Engineering Limited

 

1. Place Dowty seals on fittings and apply 

anti seize grease to threads.

 

2. Ensure flow arrow on the valve is facing the 

correct way then screw valve into pipe.

 

3. Torque fittings to the fitting suppliers 

 

recommendations.

 

4. Installation complete, check for leaks with 

snoop or soapy water on first use.

 

Note: 

Oasis recommends routine back pressure leakage testing as part of a good 

 

preventative maintenance schedule and servicing the valves as required. This will ensure safe 

and reliable operation over their life time.

 

We reserve the right to modify product specifications without prior notice.

 

CV300

-

INS

-

04 2822© Oasis Engineering Limited

 

Installation  

Instructions 

Содержание CV300 Series

Страница 1: ...death Oasis products must be installed operated and maintained by trained and competent personnel in accordance with all applicable local codes rules and regulations in addition to the Oasis Instruct...

Страница 2: ...k is carried out Warning High pressure gas and gas equipment can cause serious harm to both infrastructure and personnel if safety precautions are not followed Oasis recommends considering the use of...

Страница 3: ...ittings to the fitting suppliers recommendations 4 Installation complete check for leaks with snoop or soapy water on first use Note Oasis recommends routine back pressure leakage testing as part of a...

Страница 4: ...d Cleaner Warm Soapy Water or Similar Pick Tool TOOL PICK Sold separately Spanner Wrenches Anti Seize Grease Loctite 771 or Similar For All Threads Sockets Torque Wrench The Complete Oasis Seal Kit mu...

Страница 5: ...eck valve in vice with body side facing up 2 Loosen body from end cap 3 Carefully remove body from valve 4 Discard check valve poppet and spring Do not throw away the stainless steel insert We reserve...

Страница 6: ...asis Engineering Limited 5 Remove end cap from vice and discard O ring and backup 6 Remove poppet seal and discard Do not scratch body Do not scratch body 7 Clean components and inspect sealing faces...

Страница 7: ...up 2 Grease O ring and Backup and place on end cap Apply anti seize to end cap thread 3 Secure end cap in vice and insert spring and poppet then place insert onto end cap 4 Carefully place body on en...

Страница 8: ...is Engineering Limited 5 Torque body 6 Depress poppet to check for smooth operation 7 Servicing complete refer to installation instructions on page 3 for re installation of product Replace Dowty seals...

Отзывы: