Assembly Hardware
OF100
STEP1
2-Φ35*Φ13*δ1.5
Washers(24)
Customized Bolt(23)
2-ST4.2*12 Screw
S
(25)
2-M6*16 Bolts (36)
STEP2
Tool
#4
#6
GROUNDING
PIN
GROUNDED
OUTLET
Then –
clean it off.
with two people – carefully lift the frame by gripping both side tubes and place
it onto the clean flat surface.
Phillips Head Multi Tool