23
4.5.1.3 Operation of measurements display
1. UPS measurements can be checked after UPS has started by pressing
select key
. The display sequence is as below figure-F (AC input
voltage)
figure-G (AC input frequency)
figure-H (UPS output
voltage)
figure-I (UPS output frequency)
figure-J (UPS loading
percentage)
figure-K (UPS output current)
figure-L (Battery voltage)
figure-M (UPS inner temperature) and back to figure-F.
F
G
H
I